阐述了在“滇中红层”地区进行输电线路工程建设诱发水土流失的原因,分析了水土流失的特点及类型,并针对性的提出了该地区输电线路工程勘测设计时预防水土流失应采取的对策,以供参考。
闡述瞭在“滇中紅層”地區進行輸電線路工程建設誘髮水土流失的原因,分析瞭水土流失的特點及類型,併針對性的提齣瞭該地區輸電線路工程勘測設計時預防水土流失應採取的對策,以供參攷。
천술료재“전중홍층”지구진행수전선로공정건설유발수토류실적원인,분석료수토류실적특점급류형,병침대성적제출료해지구수전선로공정감측설계시예방수토류실응채취적대책,이공삼고。
The reason which soil and water loss is setted up in region of“red-bed of central part of Yunnan”by engineering experience which transmission line project is surveyed and designed. At the same time,characteristics and type of oil and water loss in“red-bed of central part of Yunnan”is brought up when transmission line project is built. Last,the countermeasures which prevent soil and water loss is putted forward when we survey and design and build the transmission line project in region of“red-bed of central part of Yunnan”,so as to reference.