以盛泽金融街及城管楼工程为例,结合该项目周边环境、地质条件及工期要求,对淤泥质土内双排桩选取原因及双排桩的应用进行了论述,结果表明:基坑开挖后,基坑外侧在经历了大量重型车辆通行情况下双排桩取得了理想效果,为后续双排桩的应用提供参考借鉴。
以盛澤金融街及城管樓工程為例,結閤該項目週邊環境、地質條件及工期要求,對淤泥質土內雙排樁選取原因及雙排樁的應用進行瞭論述,結果錶明:基坑開挖後,基坑外側在經歷瞭大量重型車輛通行情況下雙排樁取得瞭理想效果,為後續雙排樁的應用提供參攷藉鑒。
이성택금융가급성관루공정위례,결합해항목주변배경、지질조건급공기요구,대어니질토내쌍배장선취원인급쌍배장적응용진행료논술,결과표명:기갱개알후,기갱외측재경력료대량중형차량통행정황하쌍배장취득료이상효과,위후속쌍배장적응용제공삼고차감。
Taking Shengze financial street and Chengguan building engineering as examples,combining with its surrounding environment,geolog-ical conditions and construction duration demands,the paper discusses double-row pile selection causes and application in silt. Results show that:after the foundation excavation,the double-row pile achieved good effects under the condition of large heavy vehicles of the external foundation pit,which has provided some guidance for double-row pile application in future.