从 CAP1400核电钢制安全壳和模块整体出厂的构想尚存在诸多不确定因素切入,按照模块整体出厂参数,依据已审批的3000~5000 t 级核电站码头初步设计资料、SG 浮吊卸货运输方案、拟采用18000 t 级半潜船运输构想、重件道路等场内设施初步设计参数,对码头、场内设施等设计方案按照理想状态同比例放大航道、港池、码头、重件道路等参数建立模型,进行模块整体出厂的改造分析。经过对船型参数、航道、港池、码头、场内设施详细的技术与经济对比分析,对模块整体出厂从理论、安全、技术、经济等方面给出了切合实际的建议。
從 CAP1400覈電鋼製安全殼和模塊整體齣廠的構想尚存在諸多不確定因素切入,按照模塊整體齣廠參數,依據已審批的3000~5000 t 級覈電站碼頭初步設計資料、SG 浮弔卸貨運輸方案、擬採用18000 t 級半潛船運輸構想、重件道路等場內設施初步設計參數,對碼頭、場內設施等設計方案按照理想狀態同比例放大航道、港池、碼頭、重件道路等參數建立模型,進行模塊整體齣廠的改造分析。經過對船型參數、航道、港池、碼頭、場內設施詳細的技術與經濟對比分析,對模塊整體齣廠從理論、安全、技術、經濟等方麵給齣瞭切閤實際的建議。
종 CAP1400핵전강제안전각화모괴정체출엄적구상상존재제다불학정인소절입,안조모괴정체출엄삼수,의거이심비적3000~5000 t 급핵전참마두초보설계자료、SG 부조사화운수방안、의채용18000 t 급반잠선운수구상、중건도로등장내설시초보설계삼수,대마두、장내설시등설계방안안조이상상태동비례방대항도、항지、마두、중건도로등삼수건립모형,진행모괴정체출엄적개조분석。경과대선형삼수、항도、항지、마두、장내설시상세적기술여경제대비분석,대모괴정체출엄종이론、안전、기술、경제등방면급출료절합실제적건의。
With the idea of CAP1400 containment and CA/CV modules in its entirety released from the fabrication shop,there are some uncertainties in this scheme.Based on the parameters of CA/CV modules,the approved drawings for heavy components wharfs of 3 000 t to 5 000 t nuclear power plant,SG offloading (using a float crane ), transportation schemes, the concept of 18 000 t semisubmersible barge, and the preliminary design parameters of site facilities,the heavy components wharf and site facilities were magnified proportionally according to the design scheme.The parameters of the sea routes,dock basin and wharfs were employed to construct the model to analyze the modification scheme of the entirety module releasing.With the technical and economical comparison and analysis, the advices on the theory, safety, techniques and cost-effectiveness shipping of CAP1400 CA/CV modules in its whole can be given.