石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2015年
1期
132-134
,共3页
阳文学%姜清兆%汪顺文%张春杰
暘文學%薑清兆%汪順文%張春傑
양문학%강청조%왕순문%장춘걸
深水%弃井%套管切割%水下井口%技术对策
深水%棄井%套管切割%水下井口%技術對策
심수%기정%투관절할%수하정구%기술대책
deepwater%abandoned well%casing cutting%subsea wellhead%technical countermeasures
深水水下井口尺寸大、强度高,由于水深增加导致切割过程中管柱受力复杂,加上切割工具的不成熟和作业经验缺乏,导致我国前期自营深水井在套管及水下井口切割弃井时遇到了很大的技术挑战,在作业时出现了不同程度的复杂情况。针对自营深水井及国外深水弃井施工案例,深入分析了深水弃井套管切割的风险点和技术难点,总结了作业失败的原因,从技术方案、弃井工具和施工参数等方面提出了针对性的改进方法,全面分析了深水弃井作业的风险点,并给出了相应预防控制措施,并在第2批深水井实施中得到了成功应用,提高了深水作业的安全性和时效性,证实了之前的改进思路的正确性,解决了深水弃井技术难题。
深水水下井口呎吋大、彊度高,由于水深增加導緻切割過程中管柱受力複雜,加上切割工具的不成熟和作業經驗缺乏,導緻我國前期自營深水井在套管及水下井口切割棄井時遇到瞭很大的技術挑戰,在作業時齣現瞭不同程度的複雜情況。針對自營深水井及國外深水棄井施工案例,深入分析瞭深水棄井套管切割的風險點和技術難點,總結瞭作業失敗的原因,從技術方案、棄井工具和施工參數等方麵提齣瞭針對性的改進方法,全麵分析瞭深水棄井作業的風險點,併給齣瞭相應預防控製措施,併在第2批深水井實施中得到瞭成功應用,提高瞭深水作業的安全性和時效性,證實瞭之前的改進思路的正確性,解決瞭深水棄井技術難題。
심수수하정구척촌대、강도고,유우수심증가도치절할과정중관주수력복잡,가상절할공구적불성숙화작업경험결핍,도치아국전기자영심수정재투관급수하정구절할기정시우도료흔대적기술도전,재작업시출현료불동정도적복잡정황。침대자영심수정급국외심수기정시공안례,심입분석료심수기정투관절할적풍험점화기술난점,총결료작업실패적원인,종기술방안、기정공구화시공삼수등방면제출료침대성적개진방법,전면분석료심수기정작업적풍험점,병급출료상응예방공제조시,병재제2비심수정실시중득도료성공응용,제고료심수작업적안전성화시효성,증실료지전적개진사로적정학성,해결료심수기정기술난제。
The deepwater subsea wellhead is of large size and high strength. The increasing water depth results in complexity of string stress during the cutting process. Plus immaturity of cutting tools and lack of experience, there is a great technical challenge to earlier self-support deepwater wells in China, when the abandoned wells’ of casing and subsea wellhead is cutting, which may result in complex conditions of varying degrees in the operation. Considering the construction cases of self-support deepwater wells and foreign deepwater abandoned wells, the risks and technical dififculties in casing cutting of deepwater abandoned wells are deeply analyzed, and the causes for failed operations are summarized. Methods to improve the technical solutions, abandoned well tools, and construction parameters are proposed. The risks in the operations of deepwater abandoned wells are fully analyzed and appropriate preventive and control measures are provided, which successfully applied in the second batch of deepwater wells to improve the safety and timeliness of deepwater operations. That conifrms the correctness of the previous improvement ideas and solves the technical problems about deepwater abandoned wells.