海洋学报(中文版)
海洋學報(中文版)
해양학보(중문판)
ACTA OCEANOLOGICA SINICA
2015年
3期
134-143
,共10页
张晓鹤%李九发%朱文武%程和琴
張曉鶴%李九髮%硃文武%程和琴
장효학%리구발%주문무%정화금
长江河口%河床演变%人类活动%潮流%泥沙运动
長江河口%河床縯變%人類活動%潮流%泥沙運動
장강하구%하상연변%인류활동%조류%니사운동
Yangtze River Estuary%geomorphic changes%human activities%tidal current%sediment transport
基于长江河口1997年以来数字地形图和近期水文泥沙实测资料,分析研究了近期长江河口大量人工整治工程和流域水库工程建造影响下的河口河道自动调整过程。结果表明:1997-2013年河口段中上游河道微冲刷、拦门沙滩顶仍保持淤积外移、口门外侧近海域冲刷的态势略有增强,而其影响原因与历史时期的自然因素影响为主略有差异,近期人类高强度活动的影响贡献率增大。首先,南支至南港和北港中上游河段河床普遍发生冲刷,河床沙活动较活跃,床面微地貌沙波发育更明显,而口门外侧海域地形略有冲刷蚀退,这些变化与流域来沙锐减有直接关系;北支、北港口门、南槽和北槽河道拦门沙河段呈淤积,尤其北槽主航道的拦门沙河段6 m水深浚深为12.5 m后回淤量很大,这些与拦门沙河道动力结构环境、河口和海域再悬浮泥沙补给有关;局部河段出现强冲和强淤现象,与近期河口工程建造有关。所以,长江河口近期正处在对自然因素变化和人类活动增强的自我缓慢地自动调整和适应过程之中。
基于長江河口1997年以來數字地形圖和近期水文泥沙實測資料,分析研究瞭近期長江河口大量人工整治工程和流域水庫工程建造影響下的河口河道自動調整過程。結果錶明:1997-2013年河口段中上遊河道微遲刷、攔門沙灘頂仍保持淤積外移、口門外側近海域遲刷的態勢略有增彊,而其影響原因與歷史時期的自然因素影響為主略有差異,近期人類高彊度活動的影響貢獻率增大。首先,南支至南港和北港中上遊河段河床普遍髮生遲刷,河床沙活動較活躍,床麵微地貌沙波髮育更明顯,而口門外側海域地形略有遲刷蝕退,這些變化與流域來沙銳減有直接關繫;北支、北港口門、南槽和北槽河道攔門沙河段呈淤積,尤其北槽主航道的攔門沙河段6 m水深浚深為12.5 m後迴淤量很大,這些與攔門沙河道動力結構環境、河口和海域再懸浮泥沙補給有關;跼部河段齣現彊遲和彊淤現象,與近期河口工程建造有關。所以,長江河口近期正處在對自然因素變化和人類活動增彊的自我緩慢地自動調整和適應過程之中。
기우장강하구1997년이래수자지형도화근기수문니사실측자료,분석연구료근기장강하구대량인공정치공정화류역수고공정건조영향하적하구하도자동조정과정。결과표명:1997-2013년하구단중상유하도미충쇄、란문사탄정잉보지어적외이、구문외측근해역충쇄적태세략유증강,이기영향원인여역사시기적자연인소영향위주략유차이,근기인류고강도활동적영향공헌솔증대。수선,남지지남항화북항중상유하단하상보편발생충쇄,하상사활동교활약,상면미지모사파발육경명현,이구문외측해역지형략유충쇄식퇴,저사변화여류역래사예감유직접관계;북지、북항구문、남조화북조하도란문사하단정어적,우기북조주항도적란문사하단6 m수심준심위12.5 m후회어량흔대,저사여란문사하도동력결구배경、하구화해역재현부니사보급유관;국부하단출현강충화강어현상,여근기하구공정건조유관。소이,장강하구근기정처재대자연인소변화화인류활동증강적자아완만지자동조정화괄응과정지중。
Based on the digital nautical charts since 1997 and recent hydrologic field observations ,the variations of e‐rosion and siltation in Yangtze River Estuary under the influence of artificial regulation engineerings and basin res‐ervoirs are analyzed .The results indicate that since 1997 ,(1) the morphological features have been undergone by slightly erosion in upper estuary ,(2) the mouth bar crest still received deposition and moved seaward ,and (3) the nearshore seabed have been increasingly eroded .And the dominant cause on those phenomena has been changed from the original nature factors to recent intensive human activities .Firstly ,the riverbed in South Branch (SB) , South Channel (SC) and the upper and middle reaches of North Channel (NC) has been eroded overall .The sedi‐ment above bed was very active and surface sediment was coarsened .Bed surface sand wave was becoming more distinct ,and the nearshore seabed outside river mouth is being eroded slightly .These variations mentioned above are attributed to river runoff and sediment load .Secondly ,there was a sediment deposition in the reaches of North Brach (NB) ,the mouth of NC and the mouth bars of North Passage (NP) and South Passage (SP) ,especially for the main channel of NP ,which matches a big quantity of back silting after the Deep Waterway Project .The reasons why caused these variations are not only changes in the dynamic structure in estuarine mouth bars ,but also varia‐tions for the supply of sediment resuspension in local area and offshore area .In addition ,the severe erosion and silt‐ation in some reaches is closely related to those estuarine engineering constructions .In a word ,the Yangtze River Estuary is in slow adjustment and adaptation under changing natural factors and intensive human activities re‐cently .