电子测试
電子測試
전자측시
ELECTRONIC TEST
2015年
4期
134-136
,共3页
简支梁%桩板梁%下穿%高铁桥梁
簡支樑%樁闆樑%下穿%高鐵橋樑
간지량%장판량%하천%고철교량
Railroad%Basic information%Survey%Temporary Works
对某公路桥梁下穿高铁桥梁进行了三维有限元模拟,分析了公路桥分别采用简支梁桥和桩板梁桥时对高铁桥梁的影响。结果表明,两种方案都不会对影响高铁桥梁的结构安全和运营安全;简支梁公路桥下穿对高铁桥梁的影响相对较小。
對某公路橋樑下穿高鐵橋樑進行瞭三維有限元模擬,分析瞭公路橋分彆採用簡支樑橋和樁闆樑橋時對高鐵橋樑的影響。結果錶明,兩種方案都不會對影響高鐵橋樑的結構安全和運營安全;簡支樑公路橋下穿對高鐵橋樑的影響相對較小。
대모공로교량하천고철교량진행료삼유유한원모의,분석료공로교분별채용간지량교화장판량교시대고철교량적영향。결과표명,량충방안도불회대영향고철교량적결구안전화운영안전;간지량공로교하천대고철교량적영향상대교소。
Railway engineering project cost basis of survey data,is one of the basic work of railway construction cost of preparation and construction design work.Detailed engineering degree and temporary survey estimates the number of columns has an important impact on the reasonableness of the railway construction project investment control and follow-up for the progress and quality assurance plays a very important role.In this paper,the railway project cost basis information to investigate and estimate the number of temporary works out the actual work experience,to investigate the scientific basis of the information to determine the reasonableness of the number of temporary works to provide a reference,so the reasonable control of the investment and ensure the smooth implementation of the project works.