二道沟金矿为急倾斜极薄矿脉,采用削壁充填法与浅孔留矿法开采,随着采深的增加,发生了多起采场岩爆。为研究岩爆发生所需高应力的来源,特对开采过程进行了采动压力监测。采用巷道变形收敛监测的方法,实测了1530采场削壁充填法回采过程中,穿脉监测巷道顶底板和两帮的收敛变形。监测结果表明:随着回采高度的增加,监测巷道顶底板间距呈减小的趋势,而两帮间距则呈增大的趋势,且两帮的变形幅度比顶底板的变形要大。并根据两帮各监测点最大收敛值,绘制了采动压力特性曲线。由该曲线可知,采动压力在距上部采场上盘回采边界约7m的范围内形成波峰,再往上盘侧则趋于平缓。对于这种比较集中的采动压力分布特点,适合采用卸压的方法对其进行控制,从而达到阻止岩爆发生所需外部高应力条件的形成。
二道溝金礦為急傾斜極薄礦脈,採用削壁充填法與淺孔留礦法開採,隨著採深的增加,髮生瞭多起採場巖爆。為研究巖爆髮生所需高應力的來源,特對開採過程進行瞭採動壓力鑑測。採用巷道變形收斂鑑測的方法,實測瞭1530採場削壁充填法迴採過程中,穿脈鑑測巷道頂底闆和兩幫的收斂變形。鑑測結果錶明:隨著迴採高度的增加,鑑測巷道頂底闆間距呈減小的趨勢,而兩幫間距則呈增大的趨勢,且兩幫的變形幅度比頂底闆的變形要大。併根據兩幫各鑑測點最大收斂值,繪製瞭採動壓力特性麯線。由該麯線可知,採動壓力在距上部採場上盤迴採邊界約7m的範圍內形成波峰,再往上盤側則趨于平緩。對于這種比較集中的採動壓力分佈特點,適閤採用卸壓的方法對其進行控製,從而達到阻止巖爆髮生所需外部高應力條件的形成。
이도구금광위급경사겁박광맥,채용삭벽충전법여천공류광법개채,수착채심적증가,발생료다기채장암폭。위연구암폭발생소수고응력적래원,특대개채과정진행료채동압력감측。채용항도변형수렴감측적방법,실측료1530채장삭벽충전법회채과정중,천맥감측항도정저판화량방적수렴변형。감측결과표명:수착회채고도적증가,감측항도정저판간거정감소적추세,이량방간거칙정증대적추세,차량방적변형폭도비정저판적변형요대。병근거량방각감측점최대수렴치,회제료채동압력특성곡선。유해곡선가지,채동압력재거상부채장상반회채변계약7m적범위내형성파봉,재왕상반측칙추우평완。대우저충비교집중적채동압력분포특점,괄합채용사압적방법대기진행공제,종이체도조지암폭발생소수외부고응력조건적형성。
The orebody of Erdaogou gold mine is steeply inclined and extremely thin,which is caved by the methods of resuing stoping and short-hole shrinkage. With the increase of mining depth, stope rockburst occurred seriously. In order to study the source of high stress needed by rockburst,the author carried out the mining pressure monitoring to mining process. With the method of tunnel convergence deformation,the convergence deformation of roof-floor and two sides was monitored in the process of the No. 1530 stope caved by resuing stoping method. The monitoring results showed that with the increase of ca-ving height,the space of monitoring tunnel roof and floor tends to decrease while the space of two sides tends to increase. Be-sides,the deformation magnitude of two sides is larger than the roof and floor. What's more,according to maximum convergence value of each monitoring point of two sides,the author drew the mining pressure characteristic curve. It is found that mining pressure formed peak value in the area of 7 m distance from the upper stope boundary,then after that tend to level off. For this relatively concentrated distribution characteristics of mining pressure,it is suitable to adopt the stress-relief method to control, so as to prevent the formation of external high stress condition needed by rockburst.