金属矿山
金屬礦山
금속광산
METAL MINE
2015年
2期
26-31
,共6页
河流%采空区%地表沉降%处治措施
河流%採空區%地錶沉降%處治措施
하류%채공구%지표침강%처치조시
River%Goaf%Surface subsidence%Treatment measure
以西石门铁矿为工程背景,采用物探、监测、数值计算等方法,开展河流下伏采空区地表沉降规律研究,提出采用“补偿法”的技术措施治理河床不均匀沉降。主要研究结论如下:采用可控源音频大地电磁法可将研究区域划分为沉陷区、危险区和低电阻异常区,其中,低电阻异常区为采空区或矿体的表现;水平挤压构造应力致使地表形成椭圆形沉陷盆地,其存在增加了地表移动盆地的范围;水平挤压构造应力降低了开采最大沉降量,但使累计沉降量呈现出“突发式”增长模式;“补偿法”永久治理措施中,防渗加固主体结构包括刚性防水层、柔性防水层及抗冲刷层,可随河床沉陷而下沉,最终填平矿体开采造成的地表不均匀沉陷。
以西石門鐵礦為工程揹景,採用物探、鑑測、數值計算等方法,開展河流下伏採空區地錶沉降規律研究,提齣採用“補償法”的技術措施治理河床不均勻沉降。主要研究結論如下:採用可控源音頻大地電磁法可將研究區域劃分為沉陷區、危險區和低電阻異常區,其中,低電阻異常區為採空區或礦體的錶現;水平擠壓構造應力緻使地錶形成橢圓形沉陷盆地,其存在增加瞭地錶移動盆地的範圍;水平擠壓構造應力降低瞭開採最大沉降量,但使纍計沉降量呈現齣“突髮式”增長模式;“補償法”永久治理措施中,防滲加固主體結構包括剛性防水層、柔性防水層及抗遲刷層,可隨河床沉陷而下沉,最終填平礦體開採造成的地錶不均勻沉陷。
이서석문철광위공정배경,채용물탐、감측、수치계산등방법,개전하류하복채공구지표침강규률연구,제출채용“보상법”적기술조시치리하상불균균침강。주요연구결론여하:채용가공원음빈대지전자법가장연구구역화분위침함구、위험구화저전조이상구,기중,저전조이상구위채공구혹광체적표현;수평제압구조응력치사지표형성타원형침함분지,기존재증가료지표이동분지적범위;수평제압구조응력강저료개채최대침강량,단사루계침강량정현출“돌발식”증장모식;“보상법”영구치리조시중,방삼가고주체결구포괄강성방수층、유성방수층급항충쇄층,가수하상침함이하침,최종전평광체개채조성적지표불균균침함。
Taking Xishimen Iron Mine as engineering background,methods such as geophysical prospecting,monitoring and numerical simulation were used to study the surface subsidence regularity of goaf underlying river. The technical measure, compensation method,was proposed to treat the riverbed with differential settlement. The main research conclusions are drawn as follows. The research region can be divided into subsidence area,danger area and low-resistance abnormal area by controlled source audio-frequency magneto-telluric,and low-resistance abnormal area generally represents the goaf or ore body. Horizontal extruding tectonic stress results in the elliptic subsidence basin formed in surface,and its existence increases the ground move-ment scope of basin. Horizontal extruding tectonic stress reduces the maximal mining subsidence,but makes the accumulative subsidence behave as gusty increase mode. In the permanent treatment measure of"compensation method",the main anti-seep-age reinforcement structure consists of rigid waterproofing layer,flexible waterproof layer and anti-scour layer,which can sink with riverbed subsidence and fully fill the surface differential settlement caused by ore body mining.