风机基础%质量控制%冬季施工
風機基礎%質量控製%鼕季施工
풍궤기출%질량공제%동계시공
wind turbine foundation%quality control%winter construction
结合LBS风电场风机基础冬季混凝土施工实例,介绍了混凝土冬季施工工艺,通过控制拌和温度、浇筑和养生温度等一系列质量控制措施,达到了预期的效果,为寒冷地区风机基础混凝土冬季施工提供了技术参考。
結閤LBS風電場風機基礎鼕季混凝土施工實例,介紹瞭混凝土鼕季施工工藝,通過控製拌和溫度、澆築和養生溫度等一繫列質量控製措施,達到瞭預期的效果,為寒冷地區風機基礎混凝土鼕季施工提供瞭技術參攷。
결합LBS풍전장풍궤기출동계혼응토시공실례,개소료혼응토동계시공공예,통과공제반화온도、요축화양생온도등일계렬질량공제조시,체도료예기적효과,위한랭지구풍궤기출혼응토동계시공제공료기술삼고。
Techniques for concrete construction in winter that adopted in the construction of wind turbine foundation of the LBS Wind Power Station are introduced.The quality control measures include the appropriate temperature of con-crete mixing, pouring and curing.Satisfactory result is obtained with these measures, which could be a useful technical reference for winter concrete construction in cold regions.