为了掌握三山岛金矿井下岩体渗水特性,确保海底采矿的生产安全,分析了新立矿区水文地质结构特点,调查了-105 m、-135 m 2个中段矿坑出水点并建立各中段渗水区水力联系,研究新立矿区岩体渗透系数张量,在一个测量面内把大测量区划分成许多小测区,把一定数量的小测区测量结果合并,得到不同大小测量面的结果。开发渗透张量计算程序,计算得出-105 m、-135 m中段岩体渗透系数张量和综合渗透系数,基于对新立矿区现场岩石露头的抽样统计,建立岩体结构面几何参数概率分布模型,通过对新立矿区岩体结构面进行随机模拟计算,得出岩体结构面连通率,修正了矿区岩体渗透系数。实测结果表明,采用连通率修正理想条件下计算出的渗透系数,具有良好的实际应用价值。
為瞭掌握三山島金礦井下巖體滲水特性,確保海底採礦的生產安全,分析瞭新立礦區水文地質結構特點,調查瞭-105 m、-135 m 2箇中段礦坑齣水點併建立各中段滲水區水力聯繫,研究新立礦區巖體滲透繫數張量,在一箇測量麵內把大測量區劃分成許多小測區,把一定數量的小測區測量結果閤併,得到不同大小測量麵的結果。開髮滲透張量計算程序,計算得齣-105 m、-135 m中段巖體滲透繫數張量和綜閤滲透繫數,基于對新立礦區現場巖石露頭的抽樣統計,建立巖體結構麵幾何參數概率分佈模型,通過對新立礦區巖體結構麵進行隨機模擬計算,得齣巖體結構麵連通率,脩正瞭礦區巖體滲透繫數。實測結果錶明,採用連通率脩正理想條件下計算齣的滲透繫數,具有良好的實際應用價值。
위료장악삼산도금광정하암체삼수특성,학보해저채광적생산안전,분석료신립광구수문지질결구특점,조사료-105 m、-135 m 2개중단광갱출수점병건립각중단삼수구수력련계,연구신립광구암체삼투계수장량,재일개측량면내파대측량구화분성허다소측구,파일정수량적소측구측량결과합병,득도불동대소측량면적결과。개발삼투장량계산정서,계산득출-105 m、-135 m중단암체삼투계수장량화종합삼투계수,기우대신립광구현장암석로두적추양통계,건립암체결구면궤하삼수개솔분포모형,통과대신립광구암체결구면진행수궤모의계산,득출암체결구면련통솔,수정료광구암체삼투계수。실측결과표명,채용련통솔수정이상조건하계산출적삼투계수,구유량호적실제응용개치。
In order to grasp the water seepage characteristics of underground rocks in Sanshandao Gold Mine,and ensure the mining production safety at seabed,the hydrological and geological features of Xinli mining area is analyzed,and the water bursting points at -105 m and -135 m middle section are investigated,and hydraulic connections of every seepage zone in the middle are built. The permeability coefficient tensor of rock mass in Xinli mining area is researched. A large measurement area is divided into various small survey zones in a measurement plane,and then the measured data from some small zones are merged to-gether,obtaining the measurement results of different areas. Based on the calculation program of permeability tensor,the permea-bility coefficient tensor and the overall permeability conductivity at -105 m and -135 m middle section are calculated out. Ac-cording to the statistics of out-crop sampling in Xinli mining area,the geometry parameter probability distribution model of rock structural plane is established. The random simulation calculation of the rock structural plane in Xinli mining area is carried out to obtain the connectivity rate of rock structural plane,and correct the rock permeability coefficient. The measured results show that the permeability coefficient n the ideal condition of the corrected connectivity rate has a good practical application value.