中国安全生产科学技术
中國安全生產科學技術
중국안전생산과학기술
JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY
2014年
12期
29-34
,共6页
成云海%冯飞胜%樊俊鹏%孙振平%白金超
成雲海%馮飛勝%樊俊鵬%孫振平%白金超
성운해%풍비성%번준붕%손진평%백금초
特厚煤层%沿空掘巷%覆岩运动%离层%控制
特厚煤層%沿空掘巷%覆巖運動%離層%控製
특후매층%연공굴항%복암운동%리층%공제
super thick coal seam%gob-side entry%overburden strata movement%bedding separation%control
特厚易发火煤层沿空巷道变形严重、覆岩裂隙和离层发育范围广,易与采空区进行气体交流,同时大大降低顶板的承载能力,影响巷道安全使用,故对巷道顶板离层机理的研究十分必要。以彬县水帘洞矿3802工作面沿空巷道为工程背景,通过直接顶的特性和岩层质量指数建立特厚煤层沿空巷道覆岩结构模型,依据离层机理的不同将顶板离层分为上部结构区、中部稳定区和下部离层区,并分别阐释其离层特征及控制思路;在上述基础上,提出离层控制方案;通过FLAC3D数值软件验证方案中锚杆(索)各项参数的合理性;最后监测结果表明支护方案设计合理,离层效果控制明显,工程实践证明了研究结果的可行性。
特厚易髮火煤層沿空巷道變形嚴重、覆巖裂隙和離層髮育範圍廣,易與採空區進行氣體交流,同時大大降低頂闆的承載能力,影響巷道安全使用,故對巷道頂闆離層機理的研究十分必要。以彬縣水簾洞礦3802工作麵沿空巷道為工程揹景,通過直接頂的特性和巖層質量指數建立特厚煤層沿空巷道覆巖結構模型,依據離層機理的不同將頂闆離層分為上部結構區、中部穩定區和下部離層區,併分彆闡釋其離層特徵及控製思路;在上述基礎上,提齣離層控製方案;通過FLAC3D數值軟件驗證方案中錨桿(索)各項參數的閤理性;最後鑑測結果錶明支護方案設計閤理,離層效果控製明顯,工程實踐證明瞭研究結果的可行性。
특후역발화매층연공항도변형엄중、복암렬극화리층발육범위엄,역여채공구진행기체교류,동시대대강저정판적승재능력,영향항도안전사용,고대항도정판리층궤리적연구십분필요。이빈현수렴동광3802공작면연공항도위공정배경,통과직접정적특성화암층질량지수건립특후매층연공항도복암결구모형,의거리층궤리적불동장정판리층분위상부결구구、중부은정구화하부리층구,병분별천석기리층특정급공제사로;재상술기출상,제출리층공제방안;통과FLAC3D수치연건험증방안중묘간(색)각항삼수적합이성;최후감측결과표명지호방안설계합리,리층효과공제명현,공정실천증명료연구결과적가행성。
Roadway deformation is serious at gob-side entry in super thick and prone to ignition coal seam, with a wide range of strata crack and bedding separation development, so the gas exchange with goaf is easy, at the same time, the bearing capacity of roof is reduced, and the safety use of roadway is influenced, so it is necessary to study the mechanism of roadway bedding separation.Taking the gob-side entry in 3802 working face of Shuiliandong Mine in Binxian as engineering background, the strata structure model at gob-side entry in super thick and prone to igni-tion coal seam was determined through the characteristics of direct roof and quality index of rock.The roof bedding separation was divided into the upper structure area, the central stabilization area and lower bedding separation area based on the different bedding separation mechanism, and the bedding separation characteristics and control ideas was interpreted respectively.On the basis of the above research, the control scheme of bedding separation was put forward, and the reasonable parameters of bolt(anchor)was verified by using FLAC3D numerical software.The mo-nitoring results showed that the design of support scheme was reasonable, the control of bedding separation was ef-fective, and the engineering practice proved the feasibility of research results.