工程塑料应用
工程塑料應用
공정소료응용
ENGINEERING PLASTICS APPLICATION
2014年
12期
62-65
,共4页
别明智%叶淑英%张芝铭%杜靖%肖利群%梁全才
彆明智%葉淑英%張芝銘%杜靖%肖利群%樑全纔
별명지%협숙영%장지명%두정%초리군%량전재
塑料%链条%注射成型%工艺
塑料%鏈條%註射成型%工藝
소료%련조%주사성형%공예
plastic%chain%injection moulding%technology
以污水处理厂污水除砂机使用的玻璃纤维增强尼龙6塑料链条的链节为例,对其注射成型加工工艺进行研究。采用正交实验法研究了料筒温度、注塑压力及速度、保压压力及时间等工艺条件对成型链节的外观和质量的影响并对成型工艺参数进行了优化。结果表明,料筒温度对链节质量的影响最大,注塑压力的影响其次,保压压力的影响较小,而注射速度和保压时间对质量几乎没有影响。当料筒温度为250℃,注塑压力为85 MPa、注射速度为55 mm/s,保压压力为70 MPa、保压时间为6 s时,成型链节的质量最大,为275.8 g,其外观光滑,无“浮纤”现象,由其组成的链条在污水处理厂装机实际运行时,达到了设计上要求的4个月的运行时间。拉伸试验结果表明,未优化前成型的272.3 g链节的拉伸断裂力低于优化后成型的275.8 g链节,且272.3 g链节根部拉伸断面有明显缩孔。
以汙水處理廠汙水除砂機使用的玻璃纖維增彊尼龍6塑料鏈條的鏈節為例,對其註射成型加工工藝進行研究。採用正交實驗法研究瞭料筒溫度、註塑壓力及速度、保壓壓力及時間等工藝條件對成型鏈節的外觀和質量的影響併對成型工藝參數進行瞭優化。結果錶明,料筒溫度對鏈節質量的影響最大,註塑壓力的影響其次,保壓壓力的影響較小,而註射速度和保壓時間對質量幾乎沒有影響。噹料筒溫度為250℃,註塑壓力為85 MPa、註射速度為55 mm/s,保壓壓力為70 MPa、保壓時間為6 s時,成型鏈節的質量最大,為275.8 g,其外觀光滑,無“浮纖”現象,由其組成的鏈條在汙水處理廠裝機實際運行時,達到瞭設計上要求的4箇月的運行時間。拉伸試驗結果錶明,未優化前成型的272.3 g鏈節的拉伸斷裂力低于優化後成型的275.8 g鏈節,且272.3 g鏈節根部拉伸斷麵有明顯縮孔。
이오수처리엄오수제사궤사용적파리섬유증강니룡6소료련조적련절위례,대기주사성형가공공예진행연구。채용정교실험법연구료료통온도、주소압력급속도、보압압력급시간등공예조건대성형련절적외관화질량적영향병대성형공예삼수진행료우화。결과표명,료통온도대련절질량적영향최대,주소압력적영향기차,보압압력적영향교소,이주사속도화보압시간대질량궤호몰유영향。당료통온도위250℃,주소압력위85 MPa、주사속도위55 mm/s,보압압력위70 MPa、보압시간위6 s시,성형련절적질량최대,위275.8 g,기외관광활,무“부섬”현상,유기조성적련조재오수처리엄장궤실제운행시,체도료설계상요구적4개월적운행시간。랍신시험결과표명,미우화전성형적272.3 g련절적랍신단렬력저우우화후성형적275.8 g련절,차272.3 g련절근부랍신단면유명현축공。
Using the plastic chain link which is made of glass fiber reinforced PA6 of desanding machine for sewage treatment in sewage treatment plant as example,the injection moulding process of the link was investigated. The effects of barrel temperature, injection pressure,injection speed,holding pressure and holding time on the weight and appearance of the link were studied by using the orthogonal analysis method and the injection moulding process parameters were optimized. The results show that the barrel temperature is the largest effect on the link weight,the injection pressure is the second effects,the effect of the holding pressure is small,the injection speed and holding time have little effect on the link weight. When the barrel temperature is 250℃,injection pressure is 85 MPa,injection rate is 55 mm/s,holding pressure is 70 MPa and holding time is 9 s,the molded link has maximum weight which’s value is 275.8 g and its appearance is smooth and has no fiber floating phenomenon. When the chain comprised of the links was installed on desanding machine in sewage treatment plant for practical working,it could meet the design requirments of working for four month. The tensile test results show that the tensile fracture strength of the 272.3 g link molded without optimizing the injection moulding is lower than that of the 275.8 g link molded after optimization and the tensile fracture section at the root of the 272.3 g link has obvious hole.