云南某难选铜矿石属低品位高结合率氧化铜矿,采用选冶联合工艺实现了对该铜矿的高效回收.浮选试验研究表明,磨矿细度为-0.074 mm 占80%,调整剂水玻璃用量800 g/t,组合捕收剂丁黄药+异戊黄(1∶1)用量240 g/t,铜回收指标最佳,经二粗二精闭路试验获得的铜精矿中铜品位9.17%,回收率17.76%.浮选尾矿经磁选除铁,磁选尾矿采用硫酸浸出,当磨矿细度为-0.045 mm 占54%,硫酸用量60 kg/t,液固比3∶1,转速250 r/min,浸出温度45℃,浸出时间2 h 时,铜浸出率为81.88%,铜的综合回收率达86.55%.
雲南某難選銅礦石屬低品位高結閤率氧化銅礦,採用選冶聯閤工藝實現瞭對該銅礦的高效迴收.浮選試驗研究錶明,磨礦細度為-0.074 mm 佔80%,調整劑水玻璃用量800 g/t,組閤捕收劑丁黃藥+異戊黃(1∶1)用量240 g/t,銅迴收指標最佳,經二粗二精閉路試驗穫得的銅精礦中銅品位9.17%,迴收率17.76%.浮選尾礦經磁選除鐵,磁選尾礦採用硫痠浸齣,噹磨礦細度為-0.045 mm 佔54%,硫痠用量60 kg/t,液固比3∶1,轉速250 r/min,浸齣溫度45℃,浸齣時間2 h 時,銅浸齣率為81.88%,銅的綜閤迴收率達86.55%.
운남모난선동광석속저품위고결합솔양화동광,채용선야연합공예실현료대해동광적고효회수.부선시험연구표명,마광세도위-0.074 mm 점80%,조정제수파리용량800 g/t,조합포수제정황약+이무황(1∶1)용량240 g/t,동회수지표최가,경이조이정폐로시험획득적동정광중동품위9.17%,회수솔17.76%.부선미광경자선제철,자선미광채용류산침출,당마광세도위-0.045 mm 점54%,류산용량60 kg/t,액고비3∶1,전속250 r/min,침출온도45℃,침출시간2 h 시,동침출솔위81.88%,동적종합회수솔체86.55%.
A refractory low-grade oxide copper ore from Yunnan which contains large amounts of combined cop-per is studied.Efficient recovery of copper is obtained by united technology of beneficiation and metallurgy.Flo-tation experiments show that with the grinding fineness of -0.074 mm 80%,the sodium silicate dosage 800 g/t,the combination collector of butyl xanthate and isoamyl xanthate (1 ∶1 )dosage 240 g/t,the optimal copper re-covery and grade of the concentrate are 1 7.76% and 9.1 7%,respectively.Iron in flotation tailings is removed by magnetic separation,and the tailings are leaching with sulfuric acid.The copper leaching rate of 81 .88% is obtained with the grinding fineness of -0.045 mm 54%,the sulfuric acid dosage 60 kg/t,the liquid -solid ra-tio 3∶1 ,the speed 250 r/min,the temperature 45℃,the leaching time 2 h,and the total recovery of copper is 86.55%.