基坑降水%地下水%数值模拟%Modlfow
基坑降水%地下水%數值模擬%Modlfow
기갱강수%지하수%수치모의%Modlfow
foundation pit dewater%groundwater%numerical simulation%modlfow
本文以印尼某电厂基坑为例,讨论了电厂基坑降水方案的选择,详细介绍了厂区的水文地质条件下,对临海复杂水文地质条件下基坑降水方案的进行设计,研究了不同降水方案的降水效果,最终确定把管井降水和明排相结合作为最优的降水方案,从而缩短了工期,降低了费用,为此类工程的降水设计提供了成功经验。
本文以印尼某電廠基坑為例,討論瞭電廠基坑降水方案的選擇,詳細介紹瞭廠區的水文地質條件下,對臨海複雜水文地質條件下基坑降水方案的進行設計,研究瞭不同降水方案的降水效果,最終確定把管井降水和明排相結閤作為最優的降水方案,從而縮短瞭工期,降低瞭費用,為此類工程的降水設計提供瞭成功經驗。
본문이인니모전엄기갱위례,토론료전엄기갱강수방안적선택,상세개소료엄구적수문지질조건하,대림해복잡수문지질조건하기갱강수방안적진행설계,연구료불동강수방안적강수효과,최종학정파관정강수화명배상결합작위최우적강수방안,종이축단료공기,강저료비용,위차류공정적강수설계제공료성공경험。
In this paper, the power plant foundation pit was taken as an example, foundation pit dewater scheme of the power plant was discussed, the hydrogeological conditions of power plant nearby the sea was introduced in detail, foundation pit dewatering schemefor complex hydrogeological conditions was designed, the effect of different foundation dewater scheme was studied, ultimately the dewatering scheme of tube well dewatering and open-ditch drainage are combined as the optimum scheme and so as to shorten the construction period, reduce cost, and successful experience for the design of such foundation pit dewater wasprovided.