西北水电
西北水電
서북수전
NORTHWEST WATER POWER
2015年
2期
23-26
,共4页
项目管理%测量%质量控制
項目管理%測量%質量控製
항목관리%측량%질량공제
project management%survey%quality control
工程测量在工程建设初期为施工区域提供起算依据,贯穿于施工、放样、开挖、工程量计算、竣工等各个方面。对测量成果进行全面复核,防止出现因测量误差或错误而产生质量事故。从原始测量成果复核开始,探讨测量质量的控制要点,从而指导施工建设。
工程測量在工程建設初期為施工區域提供起算依據,貫穿于施工、放樣、開挖、工程量計算、竣工等各箇方麵。對測量成果進行全麵複覈,防止齣現因測量誤差或錯誤而產生質量事故。從原始測量成果複覈開始,探討測量質量的控製要點,從而指導施工建設。
공정측량재공정건설초기위시공구역제공기산의거,관천우시공、방양、개알、공정량계산、준공등각개방면。대측량성과진행전면복핵,방지출현인측량오차혹착오이산생질량사고。종원시측량성과복핵개시,탐토측량질량적공제요점,종이지도시공건설。
At the initial stage of construction, engineering surveying provide the construction area with calculation basis.It thoroughly ex-ists in construction, setting-out, excavation, work quantity calculation and completion, etc.The surveying results are fully rechecked to prevent quality incident from surveying error or mistake.In this paper, the control points of the surveying quality are studied from the re-check of the original surveying results so as to guide construction .