堆石%混凝土%导流围堰%乌东德水电站
堆石%混凝土%導流圍堰%烏東德水電站
퇴석%혼응토%도류위언%오동덕수전참
rockfill%concrete%river diversion cofferdam%Wudongde Hydropower Project
乌东德水电站是长江干流的特大水电站工程,关乎工程度汛安全。其右岸导流洞工期异常紧张,经过研究并结合现场试验,施工全部采用堆石混凝土浇筑,最终大大地缩短了工期,节约了成本,堆石混凝土的浇筑效果完全满足设计要求。
烏東德水電站是長江榦流的特大水電站工程,關乎工程度汛安全。其右岸導流洞工期異常緊張,經過研究併結閤現場試驗,施工全部採用堆石混凝土澆築,最終大大地縮短瞭工期,節約瞭成本,堆石混凝土的澆築效果完全滿足設計要求。
오동덕수전참시장강간류적특대수전참공정,관호공정도신안전。기우안도류동공기이상긴장,경과연구병결합현장시험,시공전부채용퇴석혼응토요축,최종대대지축단료공기,절약료성본,퇴석혼응토적요축효과완전만족설계요구。
Wudongde Hydropower Project is a super large one on the main stream of the Yangtze River.Its safety during the flood season is very crucial.The construction period of the diversion tunnel on right bank is very short.Through careful study and in combination of site test, the cofferdam is completely built with rockfill concrete, which largely shortens the construction period and reduce the cost.The placement of the rockfill concrete fully satisfied design requirements.