金属矿山
金屬礦山
금속광산
METAL MINE
2015年
4期
61-65
,共5页
张丙涛%刘艳章%李海龙%张群%鲁培培%刘伟
張丙濤%劉豔章%李海龍%張群%魯培培%劉偉
장병도%류염장%리해룡%장군%로배배%류위
露天矿%动态复垦模式%喷播绿化技术%采后复垦模式
露天礦%動態複墾模式%噴播綠化技術%採後複墾模式
로천광%동태복은모식%분파녹화기술%채후복은모식
Open pit mine%Dynamic reclamation mode%Spray seeding technique%Mining afterwards reclamation mode
为更好地改善和恢复朝国露天矿开采破坏的矿区生态环境,结合矿区的自然条件、开采技术条件和生态环境破坏预测,提出一种动态复垦模式。该动态复垦模式将矿区复垦工作动态地贯穿于采矿整个生命周期中,在采矿的设计、施工生产和闭坑不同阶段分别对采场、排土场、运输公路和工业场地进行复垦规划、动态复垦推进和剩余复垦,并在初期复垦结束后进行复垦效果评价与补充复垦。特别是在采场采剥期间,采用喷播绿化技术和覆土播种方法对采场台阶进行动态复垦,形成了边采矿边复垦的作业模式。针对目前矿区复垦存在的问题,进行了该动态复垦模式和采后复垦模式下的矿区复垦比较,结果表明该动态复垦模式可提前完成矿区复垦,且采场复垦效果好。建议矿区从现阶段开始依据该动态复垦模式进行复垦。
為更好地改善和恢複朝國露天礦開採破壞的礦區生態環境,結閤礦區的自然條件、開採技術條件和生態環境破壞預測,提齣一種動態複墾模式。該動態複墾模式將礦區複墾工作動態地貫穿于採礦整箇生命週期中,在採礦的設計、施工生產和閉坑不同階段分彆對採場、排土場、運輸公路和工業場地進行複墾規劃、動態複墾推進和剩餘複墾,併在初期複墾結束後進行複墾效果評價與補充複墾。特彆是在採場採剝期間,採用噴播綠化技術和覆土播種方法對採場檯階進行動態複墾,形成瞭邊採礦邊複墾的作業模式。針對目前礦區複墾存在的問題,進行瞭該動態複墾模式和採後複墾模式下的礦區複墾比較,結果錶明該動態複墾模式可提前完成礦區複墾,且採場複墾效果好。建議礦區從現階段開始依據該動態複墾模式進行複墾。
위경호지개선화회복조국로천광개채파배적광구생태배경,결합광구적자연조건、개채기술조건화생태배경파배예측,제출일충동태복은모식。해동태복은모식장광구복은공작동태지관천우채광정개생명주기중,재채광적설계、시공생산화폐갱불동계단분별대채장、배토장、운수공로화공업장지진행복은규화、동태복은추진화잉여복은,병재초기복은결속후진행복은효과평개여보충복은。특별시재채장채박기간,채용분파녹화기술화복토파충방법대채장태계진행동태복은,형성료변채광변복은적작업모식。침대목전광구복은존재적문제,진행료해동태복은모식화채후복은모식하적광구복은비교,결과표명해동태복은모식가제전완성광구복은,차채장복은효과호。건의광구종현계단개시의거해동태복은모식진행복은。
To better improve and restore the ecological environment damaged by mining of Chaoguo open pit mine,a dy-namic reclamation mode is proposed based on natural conditions,mining technique conditions and ecological damage prediction of the mining area. The dynamic reclamation mode makes the reclamation work dynamically throughout the entire process of mining project. Reclamation planning,dynamic reclamation advance and comprehensive reclamation work of stope,dump,trans-port roads and industrial site are respectively carried out at different stages of design,construction and production and closure of mining. Reclamation effect evaluation and supplementary reclamation will be made after the end of initial stage of reclamation. Especially during the stripping and mining in stope,spray seeding technique and the soil covering planting method are applied for dynamic reclamation of stope steps, making the stope reclamation and mining work synchronously. Aimed at the existing problems in the reclamation of mine area,the dynamic reclamation mode and the mining afterwards reclamation mode are sepa-rately used and compared in the area reclamation. The results show that the former can complete the reclamation earlier with better effect,so it′s suggested that the mining area be restored by taking the dynamic reclamation mode from now on.