小纪汗煤矿主排水泵房布置在复合岩层中,采用半圆拱型断面,宽6.04m,高8.92m,掘进断面50m2,为高帮大断面永久硐室,支护难度大、要求高。运用数值模拟方法分析得出了高帮大断面硐室围岩变形破坏特征为以两帮破坏为主的结论,提出了做好控顶工作的同时应着重加强帮部支护的设计思想。采用以高强锚杆、锚索为主体的锚网喷联合支护方案,有效地控制了围岩变形,收到了良好的支护效果。
小紀汗煤礦主排水泵房佈置在複閤巖層中,採用半圓拱型斷麵,寬6.04m,高8.92m,掘進斷麵50m2,為高幫大斷麵永久硐室,支護難度大、要求高。運用數值模擬方法分析得齣瞭高幫大斷麵硐室圍巖變形破壞特徵為以兩幫破壞為主的結論,提齣瞭做好控頂工作的同時應著重加彊幫部支護的設計思想。採用以高彊錨桿、錨索為主體的錨網噴聯閤支護方案,有效地控製瞭圍巖變形,收到瞭良好的支護效果。
소기한매광주배수빙방포치재복합암층중,채용반원공형단면,관6.04m,고8.92m,굴진단면50m2,위고방대단면영구동실,지호난도대、요구고。운용수치모의방법분석득출료고방대단면동실위암변형파배특정위이량방파배위주적결론,제출료주호공정공작적동시응착중가강방부지호적설계사상。채용이고강묘간、묘색위주체적묘망분연합지호방안,유효지공제료위암변형,수도료량호적지호효과。
Main drainage pump room was in combined rock. The semicircular-arch-shape pump cavern was 6. 04m wide and 8. 92m high and its area reached 50m2. For the high-wall and large-section permanent cavern, supporting was difficult. Applying numerical simulation method, it was obtained that two-side of the cavern was main failure location. Supporting design of reinforcing two-side sup-porting on the premise of controlling roof was put forward. After applying combined supporting projection of anchored mesh and spraying with high-strength anchored bolt and cable, surrounding rock deformation was controlled effectively and supporting effect was excellent.