铁道科学与工程学报
鐵道科學與工程學報
철도과학여공정학보
JOURNAL OF RAILWAY SCIENCE AND ENGINEERING
2015年
2期
335-341
,共7页
李军%曾一帆%陈辉%刘学明%宋旭明%马昆林
李軍%曾一帆%陳輝%劉學明%宋旭明%馬昆林
리군%증일범%진휘%류학명%송욱명%마곤림
大跨径%连续刚构桥%顶推力%顶推位移
大跨徑%連續剛構橋%頂推力%頂推位移
대과경%련속강구교%정추력%정추위이
long span%continuous rigid-frame bridge%jacking force%jacking displacement
总结大跨度连续刚构桥合龙段施工的影响因素及中跨合龙顶推力计算方法,并针对黔江某特大预应力连续刚构桥进行顶推力及顶推位移计算。采用有限元分析方法,分析中跨顶推合龙施工对该桥梁在恒载作用和10 a收缩徐变作用下的主梁跨中挠度、主梁应力、主墩的弯矩及应力状态的影响,证明顶推合龙施工的合理性及正确性。分析结果表明:顶推施工能改善桥墩长期受力状态,避免桥墩墩底出现拉应力,配合预拱度设置,能够有效解决跨中下挠的病害。最后,验证了针对本桥所计算出来的顶推力及顶推位移能满足安全施工及运营阶段的正常使用。
總結大跨度連續剛構橋閤龍段施工的影響因素及中跨閤龍頂推力計算方法,併針對黔江某特大預應力連續剛構橋進行頂推力及頂推位移計算。採用有限元分析方法,分析中跨頂推閤龍施工對該橋樑在恆載作用和10 a收縮徐變作用下的主樑跨中撓度、主樑應力、主墩的彎矩及應力狀態的影響,證明頂推閤龍施工的閤理性及正確性。分析結果錶明:頂推施工能改善橋墩長期受力狀態,避免橋墩墩底齣現拉應力,配閤預拱度設置,能夠有效解決跨中下撓的病害。最後,驗證瞭針對本橋所計算齣來的頂推力及頂推位移能滿足安全施工及運營階段的正常使用。
총결대과도련속강구교합룡단시공적영향인소급중과합룡정추력계산방법,병침대검강모특대예응력련속강구교진행정추력급정추위이계산。채용유한원분석방법,분석중과정추합룡시공대해교량재항재작용화10 a수축서변작용하적주량과중뇨도、주량응력、주돈적만구급응력상태적영향,증명정추합룡시공적합이성급정학성。분석결과표명:정추시공능개선교돈장기수력상태,피면교돈돈저출현랍응력,배합예공도설치,능구유효해결과중하뇨적병해。최후,험증료침대본교소계산출래적정추력급정추위이능만족안전시공급운영계단적정상사용。
This paper summarized the factors that influence the middle span jacking construction for long-span continuous rigid-frame bridges,and the calculation method of the jacking force and jacking displacement.U-sing this method,the jacking force and jacking displacement of a long -span continuous rigid -frame bridge across Qian River were calculated.Finite element analysis was utilized in this paper for estimating the influence of the middle span jacking construction on the mid -span deflection,the stress of main -girder,the bending moment and stress state of the bridge under the effect of dead load and 10 years’shrinkage and creep,which proved the rationality and validity of the middle span jacking construction.The results show that the construction method is reasonable and correct.The jacking closure construction method can improve the stress state of the bot-tom of the main pier.And with the use of pre-camber,it can effectively solve the mid-span deflection dis-ease.Finally,this paper proves that the jacking force and jacking displacement on this bridge can meet the de-mands of safe-construction and normal operation stage.