山西建筑
山西建築
산서건축
SHANXI ARCHITECTURE
2015年
11期
162-163,164
,共3页
隧道%隧道变形分析%基准点%监测点
隧道%隧道變形分析%基準點%鑑測點
수도%수도변형분석%기준점%감측점
tunnel%tunnel deformation analysis%datum point%monitoring point
鉴于两宜隧道施工过程中山体地表、隧道仰拱及隧道衬砌出现裂痕的情况,进行了隧道山体地表和隧道峒身监测的方法研究,提出了判断监测体有无变形、变形规律及是否稳定的方法,为后续施工和病害整治提供了参考依据。
鑒于兩宜隧道施工過程中山體地錶、隧道仰拱及隧道襯砌齣現裂痕的情況,進行瞭隧道山體地錶和隧道峒身鑑測的方法研究,提齣瞭判斷鑑測體有無變形、變形規律及是否穩定的方法,為後續施工和病害整治提供瞭參攷依據。
감우량의수도시공과정중산체지표、수도앙공급수도츤체출현렬흔적정황,진행료수도산체지표화수도동신감측적방법연구,제출료판단감측체유무변형、변형규률급시부은정적방법,위후속시공화병해정치제공료삼고의거。
Based on cracks on mountainous surface,inverted arches and tunnel lining in Liangyi tunnel construction process,the paper resear-ches the monitoring methods for the tunnel mountainous surface and cavern inspection,points out the methods to judge whether the tested body is deformed or not and their change rules are stable or not,so as to provide some reference for the following construction and disease treatment.