中国安全生产科学技术
中國安全生產科學技術
중국안전생산과학기술
JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY
2015年
4期
95-101
,共7页
鲜涛%姚安林%李熠辰%万甫%周旭
鮮濤%姚安林%李熠辰%萬甫%週旭
선도%요안림%리습신%만보%주욱
油气管道%施工质量%风险评价%属性识别%熵权%组合赋权
油氣管道%施工質量%風險評價%屬性識彆%熵權%組閤賦權
유기관도%시공질량%풍험평개%속성식별%적권%조합부권
oil&gas pipelines%constructing quality%risk assessment%attribute recognition%entropy weight%com-bination weight assigning
为了贴近客观实际地评价油气管道施工质量风险,提出了基于属性识别模型的风险评价方法。首先建立属性空间矩阵并进行有序分割,采用客观赋权的熵权法和主观赋权的G1法组合赋权确定各评价指标权重和属性测度,利用置信度准则对模型进行识别,得到管道施工质量降低可能性等级。然后评价管道施工质量降低的后果,依据风险矩阵得到施工质量风险等级。算例表明:人员的素质、错误行为、施工工艺方法和管理方法对油气管道施工质量的影响较大。管段S4、S5发生油气管道施工质量降低的可能性偏高,通过风险矩阵得到管段S4、S5的风险等级也偏高。因此,管道公司和施工单位应着重管控管段S4、S5的风险因素。
為瞭貼近客觀實際地評價油氣管道施工質量風險,提齣瞭基于屬性識彆模型的風險評價方法。首先建立屬性空間矩陣併進行有序分割,採用客觀賦權的熵權法和主觀賦權的G1法組閤賦權確定各評價指標權重和屬性測度,利用置信度準則對模型進行識彆,得到管道施工質量降低可能性等級。然後評價管道施工質量降低的後果,依據風險矩陣得到施工質量風險等級。算例錶明:人員的素質、錯誤行為、施工工藝方法和管理方法對油氣管道施工質量的影響較大。管段S4、S5髮生油氣管道施工質量降低的可能性偏高,通過風險矩陣得到管段S4、S5的風險等級也偏高。因此,管道公司和施工單位應著重管控管段S4、S5的風險因素。
위료첩근객관실제지평개유기관도시공질량풍험,제출료기우속성식별모형적풍험평개방법。수선건립속성공간구진병진행유서분할,채용객관부권적적권법화주관부권적G1법조합부권학정각평개지표권중화속성측도,이용치신도준칙대모형진행식별,득도관도시공질량강저가능성등급。연후평개관도시공질량강저적후과,의거풍험구진득도시공질량풍험등급。산례표명:인원적소질、착오행위、시공공예방법화관리방법대유기관도시공질량적영향교대。관단S4、S5발생유기관도시공질량강저적가능성편고,통과풍험구진득도관단S4、S5적풍험등급야편고。인차,관도공사화시공단위응착중관공관단S4、S5적풍험인소。
In order to realistically evaluate the risk on construction quality of oil &gas pipelines, a risk evaluation method was put forward based on attribute recognition model.Firstly, the attribute space matrix was established and orderly divided.The combination weight assigning of entropy weight method with objective weight assigning and G1 method with subjective weight assigning was applied to determine the weight and attribute measurement of each e-valuation index.The confidence criterion was used to recognize the model and obtain the possibility level of quality reduction in pipelines construction.Finally, the result of quality reduction in pipelines construction was evaluated, and the risk grade was obtained by risk matrix.The given example showed that the construction quality of oil&gas pipelines is greatly affected by the quality and wrong behaviors of personnel, construction technology and manage-ment method.The possibility that the construction quality of oil&gas pipelines will reduce in section S4 and S5 is higher.There is a high level of risk in section S4 and S5 by risk matrix.Therefore, attention and concern should be paid to manage and control the risk factors in section S4 and S5 by pipeline company and construction company..