中国安全生产科学技术
中國安全生產科學技術
중국안전생산과학기술
JOURNAL OF SAFETY SCIENCE AND TECHNOLOGY
2015年
4期
27-32
,共6页
刘勇%刘建磊%温志辉%魏建平
劉勇%劉建磊%溫誌輝%魏建平
류용%류건뢰%온지휘%위건평
多级破煤%水力冲孔%堵孔%瓦斯抽采%松软低透煤层
多級破煤%水力遲孔%堵孔%瓦斯抽採%鬆軟低透煤層
다급파매%수력충공%도공%와사추채%송연저투매층
multi-stage coal breaking%hydraulic punching%plugging holes%gas drainage%soft coal seams with low permeability
在松软低透煤层中应用水力冲孔强化瓦斯抽采时,经常出现堵孔、卡钻等现象。针对这一问题,提出多级破煤水力冲孔技术。在分析堵孔发生原因的基础上,研制了多级破煤系统装置:一级破煤装置对原始煤体进行初始破碎;二级破煤装置对包裹在钻头及钻杆周边的煤渣、煤泥进行破碎、清除;三级破煤装置对小块煤体再次研磨。基于淹没射流速度场分布特征,分析了二级破煤装置射流轴向流速衰减规律,确定了二级破煤装置与一级破煤装置的最佳距离。在此基础上研发了多级破煤水力冲孔工艺,并应用于鹤煤八矿-655轨道石门揭煤瓦斯预抽,应用结果表明采用多级破煤水力冲孔工艺能够实现排渣顺畅,避免堵孔等现象的发生,单孔出煤量为3~8吨,冲孔后瓦斯抽采浓度及抽采流量均提高了3~15倍,石门预抽达标时间缩短至三个月以内,为安全快速揭煤提供了良好基础。
在鬆軟低透煤層中應用水力遲孔彊化瓦斯抽採時,經常齣現堵孔、卡鑽等現象。針對這一問題,提齣多級破煤水力遲孔技術。在分析堵孔髮生原因的基礎上,研製瞭多級破煤繫統裝置:一級破煤裝置對原始煤體進行初始破碎;二級破煤裝置對包裹在鑽頭及鑽桿週邊的煤渣、煤泥進行破碎、清除;三級破煤裝置對小塊煤體再次研磨。基于淹沒射流速度場分佈特徵,分析瞭二級破煤裝置射流軸嚮流速衰減規律,確定瞭二級破煤裝置與一級破煤裝置的最佳距離。在此基礎上研髮瞭多級破煤水力遲孔工藝,併應用于鶴煤八礦-655軌道石門揭煤瓦斯預抽,應用結果錶明採用多級破煤水力遲孔工藝能夠實現排渣順暢,避免堵孔等現象的髮生,單孔齣煤量為3~8噸,遲孔後瓦斯抽採濃度及抽採流量均提高瞭3~15倍,石門預抽達標時間縮短至三箇月以內,為安全快速揭煤提供瞭良好基礎。
재송연저투매층중응용수력충공강화와사추채시,경상출현도공、잡찬등현상。침대저일문제,제출다급파매수력충공기술。재분석도공발생원인적기출상,연제료다급파매계통장치:일급파매장치대원시매체진행초시파쇄;이급파매장치대포과재찬두급찬간주변적매사、매니진행파쇄、청제;삼급파매장치대소괴매체재차연마。기우엄몰사류속도장분포특정,분석료이급파매장치사류축향류속쇠감규률,학정료이급파매장치여일급파매장치적최가거리。재차기출상연발료다급파매수력충공공예,병응용우학매팔광-655궤도석문게매와사예추,응용결과표명채용다급파매수력충공공예능구실현배사순창,피면도공등현상적발생,단공출매량위3~8둔,충공후와사추채농도급추채류량균제고료3~15배,석문예추체표시간축단지삼개월이내,위안전쾌속게매제공료량호기출。
In soft coal seams with low permeability, when using hydraulic punching to enhance the gas drainage, the phenomena of plugging holes and sticking often occur.To solve this problem, the technology of hydraulic punc-hing by multi-stage coal breaking was proposed.Based on the analysis on the causes of plugging holes, the multi-stage coal breaking system device was developed.The 1st level coal breaking device is to crush the original coal in-itially, the 2nd level coal breaking device is to clear the cinder or slime wrapping the drill and it's surroundings, and the 3rd level coal breaking device is to grind small pieces of coal again.Based on the distribution characteris-tics of submerged jet velocity field, the attenuation laws of axial velocity on the 2nd level coal breaking device were analyzed, and the optimal distance of the 2nd level coal breaking device and the 1st level coal breaking device was determined.The multi-stage hydraulic punching process was developed, and was applied in gas pre-drainage of the-655 horizontal roadway rock cross-cut coal uncovering in the No.8 Hebi Coal Mine.The application result showed that using the multi-stage hydraulic punching can realize the smooth slagging and avoid the holes plugging.The coal output of single hole was 3 tons to 8 tons, the concentration and flow of gas drainage increased 3~15 times after punching, and the pre-drainage time up to the standard was shortened to 3 months, which provides a good basis for uncovering coal safe and quickly.