交通运输系统工程与信息
交通運輸繫統工程與信息
교통운수계통공정여신식
JOURNAL OF COMMUNICATION AND TRANSPORTATION SYSTEMS ENGINEERING AND INFORMATION
2015年
2期
10-16
,共7页
综合交通运输%资源环境承载力%模糊物元%预警
綜閤交通運輸%資源環境承載力%模糊物元%預警
종합교통운수%자원배경승재력%모호물원%예경
integrated transportation%resources and environment carrying capacity%fuzzy matter element%early warning
新常态下快速发展的综合交通运输对资源环境的胁迫作用日益明显,资源环境对交通运输的承载能力成为地区健康发展的重要衡量标准。在界定交通资源环境承载力概念的基础上,从资源承载力和生态环境承载力两个方面构建交通资源环境承载力指标体系。结合可拓学的模糊物元理论和信息论的熵理论,建立基于模糊物元的交通资源环境承载力的预警模型,并对长江经济带七省二市的交通资源环境承载力进行预警研究。实例结果表明,构建的交通资源环境承载力指标体系基本合理,模糊物元预警模型在资源环境承载力的预警研究中具有较强的适用性和可操作性。
新常態下快速髮展的綜閤交通運輸對資源環境的脅迫作用日益明顯,資源環境對交通運輸的承載能力成為地區健康髮展的重要衡量標準。在界定交通資源環境承載力概唸的基礎上,從資源承載力和生態環境承載力兩箇方麵構建交通資源環境承載力指標體繫。結閤可拓學的模糊物元理論和信息論的熵理論,建立基于模糊物元的交通資源環境承載力的預警模型,併對長江經濟帶七省二市的交通資源環境承載力進行預警研究。實例結果錶明,構建的交通資源環境承載力指標體繫基本閤理,模糊物元預警模型在資源環境承載力的預警研究中具有較彊的適用性和可操作性。
신상태하쾌속발전적종합교통운수대자원배경적협박작용일익명현,자원배경대교통운수적승재능력성위지구건강발전적중요형량표준。재계정교통자원배경승재력개념적기출상,종자원승재력화생태배경승재력량개방면구건교통자원배경승재력지표체계。결합가탁학적모호물원이론화신식론적적이론,건립기우모호물원적교통자원배경승재력적예경모형,병대장강경제대칠성이시적교통자원배경승재력진행예경연구。실례결과표명,구건적교통자원배경승재력지표체계기본합리,모호물원예경모형재자원배경승재력적예경연구중구유교강적괄용성화가조작성。
The rapid development of integrated transportation in the new normal poses an increasing threat to environment and resources. The bearing capacity of environment and resources to transportation becomes a significant criterion to measure whether an area is developing healthily. Based on the definition of traffic resource environmental bearing capacity, a traffic resource and environmental bearing capacity index system is built from both resources carrying capacity and environmental carrying capacity aspects. Through combining fuzzy matter-element theory of extension theory with entropy theory, an early-warning model of traffic resource and environmental bearing capacity is established, this model is applied to study the traffic resources and environmental carrying capacity of Yangtze River economic belt (include seven provinces and two municipalities as well). The results demonstrate that:The traffic resources and environmental carrying capacity index system is reasonable and the fuzzy matter-element model used in studying the early-warning of resources environmental bearing capacity is of sound applicability and operability.