桥梁工程%钢箱梁%顶推装置%步履式%施工技术
橋樑工程%鋼箱樑%頂推裝置%步履式%施工技術
교량공정%강상량%정추장치%보리식%시공기술
bridges%steel box girder%incremental launching device%walking-style%construction
以蚌埠市淮河公路桥工程为依托,研发了一种拼装式的步履式顶推施工装置,介绍了该桥钢箱梁步履式顶推施工的工艺方法,以及施工中多点同步控制系统出现问题的解决方法。实践证明了该顶推装置能够完全满足步履式顶推工艺技术的要求。
以蚌埠市淮河公路橋工程為依託,研髮瞭一種拼裝式的步履式頂推施工裝置,介紹瞭該橋鋼箱樑步履式頂推施工的工藝方法,以及施工中多點同步控製繫統齣現問題的解決方法。實踐證明瞭該頂推裝置能夠完全滿足步履式頂推工藝技術的要求。
이방부시회하공로교공정위의탁,연발료일충병장식적보리식정추시공장치,개소료해교강상량보리식정추시공적공예방법,이급시공중다점동보공제계통출현문제적해결방법。실천증명료해정추장치능구완전만족보리식정추공예기술적요구。
Based on the Huaihe River highway bridge project in Bengbu city, a sort of combinatorial walking?style incremental launching device was excogitated. The walking?style incremental launching construction method for steel box girder of the bridge and the method to solve the problem of the multi?point isochronous control system in construction are introduced. The practice proves that the incremental launching device can meet completely the needs for the technology of walking?style incremental launching.