HYDROPOWER AND NEW ENERGY
2015年
3期
49-50
,共2页
杨京广%李长华%高劲松%曹凯
楊京廣%李長華%高勁鬆%曹凱
양경엄%리장화%고경송%조개
发电机组%上导轴承%推力轴承%水导轴承%测温装置%改进
髮電機組%上導軸承%推力軸承%水導軸承%測溫裝置%改進
발전궤조%상도축승%추력축승%수도축승%측온장치%개진
generator unit%upper guide bearing%thrust bearing%water pilot bearing%temperature measuring device%renovation
介绍了葛洲坝电厂机组3大轴承(上导轴承、推力轴承、水导轴承)测温装置存在的缺点,针对存在的缺点,分别提出了改进措施,改造后的3大轴承测温装置运行正常,改造效果良好。
介紹瞭葛洲壩電廠機組3大軸承(上導軸承、推力軸承、水導軸承)測溫裝置存在的缺點,針對存在的缺點,分彆提齣瞭改進措施,改造後的3大軸承測溫裝置運行正常,改造效果良好。
개소료갈주패전엄궤조3대축승(상도축승、추력축승、수도축승)측온장치존재적결점,침대존재적결점,분별제출료개진조시,개조후적3대축승측온장치운행정상,개조효과량호。
Problems are found in the temperature measuring devices for the three main bearings ( the upper guide bear-ing, thrust bearing and water pilot bearing) in generator units in Gezhouba Hydropower Station.Renovation measures are then proposed and implemented.After the renovation, the temperature measuring devices now operate properly.