人民黄河
人民黃河
인민황하
Yellow River
2015年
4期
140-144
,共5页
程玉菲%胡想全%李元红%王军德%李莉
程玉菲%鬍想全%李元紅%王軍德%李莉
정옥비%호상전%리원홍%왕군덕%리리
地下水动态%地下水开采%优化分析%党河灌区
地下水動態%地下水開採%優化分析%黨河灌區
지하수동태%지하수개채%우화분석%당하관구
groundwater dynamic%groundwater extraction%optimized analysis%Danghe River irrigated area
针对近年来党河灌区地下水资源的过度开采造成严重生态环境问题的现状,在分析该区地下水变化特征的基础上,重点开展地下水开采的优化分析研究。主要通过水位约束、水量约束、生态环境约束三个方面,建立相应的控制方程,对地下水资源的数量、质量、时空分布特征和开发利用条件作出科学全面的分析和估计。结果表明:根据“地下水快速下降区内机井全部关闭、地下水缓慢下降区内机井部分关闭、基本稳定区机井保持现状、月牙泉周围1 km范围内机井全部关闭”的原则,提出了各乡镇灌溉机井的配置方案,全灌区灌溉机井数量由2009年的2571眼压减到2015年的1041眼和2020年的868眼,并提出不同乡镇的地下水优化开采量。
針對近年來黨河灌區地下水資源的過度開採造成嚴重生態環境問題的現狀,在分析該區地下水變化特徵的基礎上,重點開展地下水開採的優化分析研究。主要通過水位約束、水量約束、生態環境約束三箇方麵,建立相應的控製方程,對地下水資源的數量、質量、時空分佈特徵和開髮利用條件作齣科學全麵的分析和估計。結果錶明:根據“地下水快速下降區內機井全部關閉、地下水緩慢下降區內機井部分關閉、基本穩定區機井保持現狀、月牙泉週圍1 km範圍內機井全部關閉”的原則,提齣瞭各鄉鎮灌溉機井的配置方案,全灌區灌溉機井數量由2009年的2571眼壓減到2015年的1041眼和2020年的868眼,併提齣不同鄉鎮的地下水優化開採量。
침대근년래당하관구지하수자원적과도개채조성엄중생태배경문제적현상,재분석해구지하수변화특정적기출상,중점개전지하수개채적우화분석연구。주요통과수위약속、수량약속、생태배경약속삼개방면,건립상응적공제방정,대지하수자원적수량、질량、시공분포특정화개발이용조건작출과학전면적분석화고계。결과표명:근거“지하수쾌속하강구내궤정전부관폐、지하수완만하강구내궤정부분관폐、기본은정구궤정보지현상、월아천주위1 km범위내궤정전부관폐”적원칙,제출료각향진관개궤정적배치방안,전관구관개궤정수량유2009년적2571안압감도2015년적1041안화2020년적868안,병제출불동향진적지하수우화개채량。
In recent years,the over-exploitation of groundwater caused serious environmental problems in Danghe River irrigated area. This study took the analysis of groundwater change characteristics as basement,focused on the analysis of the optimization of groundwater exploita-tion. The appropriate equations were established by groundwater level constraints,groundwater quantity constraints and ecological environ-mental constrains,which could scientifically analyze and estimate the quantity,quality and space-time distribution of groundwater resources as well as exploitation conditions. The results show that according to the principle (the groundwater wells with rapid decline in the region should be all closed,groundwater wells with slow decline should be partially closed,groundwater wells in basically stable area should be maintained the status quo and all wells within 1 km range around Crescent Spring must be closed),the wells configuration scheme of town-ship irrigation has been proposed,the number of irrigation wells is reduced from 2 571 in 2009 to 1 041 in 2015 and 868 in 2020,and puts forward optimized amount of groundwater exploitation of different towns in Danghe River irrigated area.