梁山隧道是厦深铁路福建段的控制工程之一,施工中遇到深埋富水陡倾软弱带,多次导致突水涌泥及洞顶塌陷情况。通过研究突水涌泥及洞顶塌陷的灾害特征,分析得到突水涌泥机制,即:在这种多因素复杂地质条件下,隧道开挖导致形成极高的渗透压力差,并产生新的地下临空通道,在地下水渗透压力作用和自身重力作用下,全风化物质涌入隧道,形成突水涌泥;而软弱构造带塌陷的主要原因为地下水位的急剧下降。通过调研、理论分析及试验等方法,确定采用长距离水平旋喷桩通过软弱带,并提出其布置形式、施工工艺及检验标准。工程实践证明,采用长距离水平旋喷桩作为预加固手段是可行且有效的。
樑山隧道是廈深鐵路福建段的控製工程之一,施工中遇到深埋富水陡傾軟弱帶,多次導緻突水湧泥及洞頂塌陷情況。通過研究突水湧泥及洞頂塌陷的災害特徵,分析得到突水湧泥機製,即:在這種多因素複雜地質條件下,隧道開挖導緻形成極高的滲透壓力差,併產生新的地下臨空通道,在地下水滲透壓力作用和自身重力作用下,全風化物質湧入隧道,形成突水湧泥;而軟弱構造帶塌陷的主要原因為地下水位的急劇下降。通過調研、理論分析及試驗等方法,確定採用長距離水平鏇噴樁通過軟弱帶,併提齣其佈置形式、施工工藝及檢驗標準。工程實踐證明,採用長距離水平鏇噴樁作為預加固手段是可行且有效的。
량산수도시하심철로복건단적공제공정지일,시공중우도심매부수두경연약대,다차도치돌수용니급동정탑함정황。통과연구돌수용니급동정탑함적재해특정,분석득도돌수용니궤제,즉:재저충다인소복잡지질조건하,수도개알도치형성겁고적삼투압력차,병산생신적지하림공통도,재지하수삼투압력작용화자신중력작용하,전풍화물질용입수도,형성돌수용니;이연약구조대탑함적주요원인위지하수위적급극하강。통과조연、이론분석급시험등방법,학정채용장거리수평선분장통과연약대,병제출기포치형식、시공공예급검험표준。공정실천증명,채용장거리수평선분장작위예가고수단시가행차유효적。
Liangshan tunnel is one of the key works on Xiamen-Shenzhen railway.During the construction of the tunnel, water gushing and mud inflow often occur,due to the deep-covered water-rich steep soft fracture zone met.In the paper, the characteristics of the water gushing,mud inflow and ground surface collapse are studied,and the water gushing and mud inflow mechanism is analyzed.It is concluded that fully-weathered materials and ground water under the effect of high seepage pressure difference induced by tunnel excavation are the main causes for the water gushing and mud inflow, and that the ground surface collapse is induced by the sudden drop of the ground water level.After investigation, theoretical analysis and tests,it is determined that long-distance horizontal jet grouting piles be used to reinforce the fracture zone.The layout,construction process and inspection standard of the jet grouting piles are also presented in the paper.The practice shows that the long-distance horizontal jet grouting piles mentioned are feasible and effective in the consolidation of the fracture zone.