探矿工程-岩土钻掘工程
探礦工程-巖土鑽掘工程
탐광공정-암토찬굴공정
EXPLORATION ENGINEERING (DRILLING & TUNNELING)
2015年
4期
16-20
,共5页
液动旋冲工具%钻具强度%钻井参数%徐深1-平3井
液動鏇遲工具%鑽具彊度%鑽井參數%徐深1-平3井
액동선충공구%찬구강도%찬정삼수%서심1-평3정
hydraulic rotary tool%strength of the new BHA%drilling parameters%Xushen 1-Ping3
为提高庆深气田水平井钻井速度,缩短钻井周期,降低钻井投资,在徐深1-平3井三开进行了旋冲钻井试验。通过分析钻具组合强度,结合不同尺寸液动旋冲工具特点,制定提速技术方案,优选钻井参数并进行现场试验。经验证,液动钻井在徐家围子深层直井段提速效果明显。试验从分析新钻具组合强度是否满足钻进需求,防止应力集中造成钻具疲劳破坏入手。根据大庆ZJ50D型钻机一般泵压≯25 MPa的实际情况,利用液动旋冲工具泵压-排量回推公式,优化钻井参数。基于参数优选结果制定针对性施工措施,确保饱279 mm型液动旋冲工具现场试验成功。
為提高慶深氣田水平井鑽井速度,縮短鑽井週期,降低鑽井投資,在徐深1-平3井三開進行瞭鏇遲鑽井試驗。通過分析鑽具組閤彊度,結閤不同呎吋液動鏇遲工具特點,製定提速技術方案,優選鑽井參數併進行現場試驗。經驗證,液動鑽井在徐傢圍子深層直井段提速效果明顯。試驗從分析新鑽具組閤彊度是否滿足鑽進需求,防止應力集中造成鑽具疲勞破壞入手。根據大慶ZJ50D型鑽機一般泵壓≯25 MPa的實際情況,利用液動鏇遲工具泵壓-排量迴推公式,優化鑽井參數。基于參數優選結果製定針對性施工措施,確保飽279 mm型液動鏇遲工具現場試驗成功。
위제고경심기전수평정찬정속도,축단찬정주기,강저찬정투자,재서심1-평3정삼개진행료선충찬정시험。통과분석찬구조합강도,결합불동척촌액동선충공구특점,제정제속기술방안,우선찬정삼수병진행현장시험。경험증,액동찬정재서가위자심층직정단제속효과명현。시험종분석신찬구조합강도시부만족찬진수구,방지응력집중조성찬구피로파배입수。근거대경ZJ50D형찬궤일반빙압≯25 MPa적실제정황,이용액동선충공구빙압-배량회추공식,우화찬정삼수。기우삼수우선결과제정침대성시공조시,학보포279 mm형액동선충공구현장시험성공。
In order to improve the drilling speed of the horizontal well to reduce drilling investment in Qingshen gas field, a rotary percussion drilling test was carried out in the 3rd opening interval of Xushen1 -Ping3.By the analysis on the strength of the BHA and according to the characteristics of hydraulic rotary tools with different dimensions, the acceleration technology scheme was formulated, the drilling parameters were optimized and the field tests were made.It was proved that there was obvious improvement in deep vertical section by hydraulic drilling.First of all, from the analysis on testing whether the new BHA strength meets the drilling requirements to prevent fatigue failure of drill caused by stress concentra-tion.The drilling parameters were optimized by the pump pressure-displacement back-stepping formula of hydraulic rotary tools under the condition of the fact that the pump pressure of ZJ50D rig is generally no more than 25MPa in Daqing.Based on the parameter optimization result, the specific construction measures were formulated to ensure the successful field test of?279mm hydraulic rotary tool.