某地铁深基坑工程,工程主体分布于富水上软下硬的复杂地质条件,设计选用三轴搅拌桩作为止水帷幕并要求三轴搅拌桩进入风化岩层,隔断基坑内外的透水层,搅拌桩如何进入风化岩是一个值得研究的技术难题。通过对三轴搅拌桩的机械选型、设计三轴搅拌桩钻头的结构形式、适用此地质条件下的施工参数等方面进行详细研究,实现三轴搅拌桩止水帷幕在泥质粉砂岩中的成功施工,达到彻底隔断透水层的目的。主要研究结论如下:1)富水上软下硬复杂地质条件下可以选用三轴搅拌桩作为止水帷幕;2)三轴搅拌桩入岩后,在类似地质条件下可选用钻孔桩+三轴搅拌桩代替地下连续墙作为围护结构体系,以节约投资。
某地鐵深基坑工程,工程主體分佈于富水上軟下硬的複雜地質條件,設計選用三軸攪拌樁作為止水帷幕併要求三軸攪拌樁進入風化巖層,隔斷基坑內外的透水層,攪拌樁如何進入風化巖是一箇值得研究的技術難題。通過對三軸攪拌樁的機械選型、設計三軸攪拌樁鑽頭的結構形式、適用此地質條件下的施工參數等方麵進行詳細研究,實現三軸攪拌樁止水帷幕在泥質粉砂巖中的成功施工,達到徹底隔斷透水層的目的。主要研究結論如下:1)富水上軟下硬複雜地質條件下可以選用三軸攪拌樁作為止水帷幕;2)三軸攪拌樁入巖後,在類似地質條件下可選用鑽孔樁+三軸攪拌樁代替地下連續牆作為圍護結構體繫,以節約投資。
모지철심기갱공정,공정주체분포우부수상연하경적복잡지질조건,설계선용삼축교반장작위지수유막병요구삼축교반장진입풍화암층,격단기갱내외적투수층,교반장여하진입풍화암시일개치득연구적기술난제。통과대삼축교반장적궤계선형、설계삼축교반장찬두적결구형식、괄용차지질조건하적시공삼수등방면진행상세연구,실현삼축교반장지수유막재니질분사암중적성공시공,체도철저격단투수층적목적。주요연구결론여하:1)부수상연하경복잡지질조건하가이선용삼축교반장작위지수유막;2)삼축교반장입암후,재유사지질조건하가선용찬공장+삼축교반장대체지하련속장작위위호결구체계,이절약투자。
The deep foundation pit under study is located in water-rich composite ground consisting soft strata at the up-per part and hard strata at the lower part. Three-axis mixing piles are designed as the water-stopping curtain of the foun-dation pit. The three-axis mixing piles are required to extend into the weathered rock so as to isolate the impermeable strata. Therefore, extending the three-axis mixing piles into the weathered rock is a technical challenge to be studied. In the paper, analysis is made on the type selection of machines for the three-axis mixing piles, a new type of drill bit is designed for the drilling machine, and construction parameters suitable for the geological conditions are studied. Conclu-sions drawn are as follows:1 ) Three-axis mixing piles can be used as the water-stopping curtain for foundation pits loca-ted in water-rich composite ground consisting soft strata at the upper part and hard strata at the lower part;2 ) Because three-axis mixing piles can be extended into weathered rock,“bored piles + three-axis mixing piles” may be used as retaining structures in geological conditions similar to those mentioned above to replace the diaphragm walls so as to reduce the investment.