隧道建设
隧道建設
수도건설
TUNNEL CONSTRUCTION
2015年
5期
449-454
,共6页
岩溶发育特征%地质结构%地铁工程%岩溶处理
巖溶髮育特徵%地質結構%地鐵工程%巖溶處理
암용발육특정%지질결구%지철공정%암용처리
karst development feature%geological structure%Metro works%karst treatment
以武汉地铁岩溶专项勘察资料和地铁工程中岩溶处理案例为依据,采用综合统计方法分析岩溶发育特征和规律,总结地铁车站、区间隧道穿越岩溶区时的处理方法。研究表明武汉地区岩溶为浅层岩溶,主要在岩面以下0~15 m范围发育,表现为溶洞、溶沟、溶槽,钻孔遇洞率约50%,线岩溶率约6%,溶洞埋置越深填充率越低。岩溶区主要分为Ⅰ,Ⅱ,Ⅲ3种地质结构类型并对应高、中、低3种岩溶塌陷风险区。根据岩溶地质结构类型分类总结武汉地铁建设中采取的注浆填充、岩层注浆帷幕、土层隔离、旋喷加固及围护结构入岩等处理措施。
以武漢地鐵巖溶專項勘察資料和地鐵工程中巖溶處理案例為依據,採用綜閤統計方法分析巖溶髮育特徵和規律,總結地鐵車站、區間隧道穿越巖溶區時的處理方法。研究錶明武漢地區巖溶為淺層巖溶,主要在巖麵以下0~15 m範圍髮育,錶現為溶洞、溶溝、溶槽,鑽孔遇洞率約50%,線巖溶率約6%,溶洞埋置越深填充率越低。巖溶區主要分為Ⅰ,Ⅱ,Ⅲ3種地質結構類型併對應高、中、低3種巖溶塌陷風險區。根據巖溶地質結構類型分類總結武漢地鐵建設中採取的註漿填充、巖層註漿帷幕、土層隔離、鏇噴加固及圍護結構入巖等處理措施。
이무한지철암용전항감찰자료화지철공정중암용처리안례위의거,채용종합통계방법분석암용발육특정화규률,총결지철차참、구간수도천월암용구시적처리방법。연구표명무한지구암용위천층암용,주요재암면이하0~15 m범위발육,표현위용동、용구、용조,찬공우동솔약50%,선암용솔약6%,용동매치월심전충솔월저。암용구주요분위Ⅰ,Ⅱ,Ⅲ3충지질결구류형병대응고、중、저3충암용탑함풍험구。근거암용지질결구류형분류총결무한지철건설중채취적주장전충、암층주장유막、토층격리、선분가고급위호결구입암등처리조시。
The features and pattern of karst development in Wuhan area are analyzed on the basis of the karst investigation data and the karst encountered in the construction of Wuhan Metro. The treatment methods for the karst encountered in the construction of Wuhan Metro are also summarized. Conclusions drawn are as follows:1) The karst in Wuhan area belongs to shallow karst, which develops mainly within the scope of 0~15 m below the rock surface;2 ) The karst in Wuhan area takes the shape of karst caves, karst channels and karst troughs;3 ) The rate of karst cave encountering in borehole drilling is about 50%, and the rate of linear karst is about 6%;4) The deeper the karst caves, the smaller the karst cave filling rate;5) The karst can be classified into 3 geological structural types, i. e. , Type I, Type Ⅱ and Type Ⅲ, which correspond to 3 karst subsidence risk zones, i. e. , high karst subsidence risk zone, medium karst subsidence risk zone and low karst subsidence risk zone;6) Countermeasures, including karst cave filling by grouting, grouting curtain installed in rocks, isolation of soil layers, reinforcement by jet-grouting piles and extending the retaining structures into the rock, are taken to cope with the karst encountered in the construction of Wuhan Metro.