对高煤公司孤岛工作面开采过程冲击地压威胁进行分析后,对采区工作面布置方案进行了优化,形成了防冲-抗震的工作面接续方案,从而确保了安全生产。
對高煤公司孤島工作麵開採過程遲擊地壓威脅進行分析後,對採區工作麵佈置方案進行瞭優化,形成瞭防遲-抗震的工作麵接續方案,從而確保瞭安全生產。
대고매공사고도공작면개채과정충격지압위협진행분석후,대채구공작면포치방안진행료우화,형성료방충-항진적공작면접속방안,종이학보료안전생산。
Aiming at the mine earthquake and rockburst problems that will be caused by the primary working face layout scheme, this paper optimized the arrangement plan of the island working face, formed the rockburst prevention and G-shock continue scheme, so as to ensure the safety of the working face and ground facilities, and provide a reference for other similar coal mine safety production.