吉林水利
吉林水利
길림수리
JI LIN WATER RESOURCES
2015年
6期
45-49
,共5页
水库群%供水调度规则%粒子群算法
水庫群%供水調度規則%粒子群算法
수고군%공수조도규칙%입자군산법
Reservoir Group%water supply scheduling rules%particle swarm optimization
针对辽宁省西部“白石-锦凌-青山”水库群工程特点,提出了基于各水库控制线的三库联合调、供水规则,并建立了三库联合调度模型。采用粒子群算法对水库调度控制线进行优化求解,得到了满足各项供水保证率的三库联合调度规则。
針對遼寧省西部“白石-錦凌-青山”水庫群工程特點,提齣瞭基于各水庫控製線的三庫聯閤調、供水規則,併建立瞭三庫聯閤調度模型。採用粒子群算法對水庫調度控製線進行優化求解,得到瞭滿足各項供水保證率的三庫聯閤調度規則。
침대요녕성서부“백석-금릉-청산”수고군공정특점,제출료기우각수고공제선적삼고연합조、공수규칙,병건립료삼고연합조도모형。채용입자군산법대수고조도공제선진행우화구해,득도료만족각항공수보증솔적삼고연합조도규칙。
For “Baishi-Jinling-Qingshan” -reservoir engineering characteristics in western Liaoning Province , based on each reservoir control line,three reservoir joint controlune,water rules is proposed,and three joint scheduling model library is the established.Particle swarm optimization reservoir operation control line solved the water supply have been met to ensure the rate of three reservoirs joint scheduling rules.