价值工程
價值工程
개치공정
VALUE ENGINEERING
2015年
18期
66-67,68
,共3页
悬臂浇筑%墩梁固结%荷载取值%设计计算%推广运用
懸臂澆築%墩樑固結%荷載取值%設計計算%推廣運用
현비요축%돈량고결%하재취치%설계계산%추엄운용
cast-in-cantilever%pier beam consolidation%load value%design calculation%promotion and application
结合武汉市二七长江大桥上跨铁路工程施工过程,采用模拟计算墩梁固结临时墩的受力,结合监控资料,得出其荷载的合理取值,并总结归纳墩梁固结的多种形式,分析优缺点,提出各种形式的适用范围。
結閤武漢市二七長江大橋上跨鐵路工程施工過程,採用模擬計算墩樑固結臨時墩的受力,結閤鑑控資料,得齣其荷載的閤理取值,併總結歸納墩樑固結的多種形式,分析優缺點,提齣各種形式的適用範圍。
결합무한시이칠장강대교상과철로공정시공과정,채용모의계산돈량고결림시돈적수력,결합감공자료,득출기하재적합리취치,병총결귀납돈량고결적다충형식,분석우결점,제출각충형식적괄용범위。
Based on the construction process of Wuhan Erqi Yangtze River Bridge overpass railway project, the stress of the temporary pier in pier beam consolidation is obtained by simulation calculation, and the reasonable value of the load is obtained combined with the monitoring data. The various forms of pier beam consolidation are concluded, and their advantages and disadvantages are analyzed, and the applicable scope of the various forms are puts forward.