桥梁建设
橋樑建設
교량건설
BRIDGE CONSTRUCTION
2015年
3期
82-87
,共6页
沈锐利%颜智法%唐茂林%朱军颖
瀋銳利%顏智法%唐茂林%硃軍穎
침예리%안지법%당무림%주군영
悬索桥%板桁结合型加劲梁%剪力滞%变分法%叠加原理%有限元法
懸索橋%闆桁結閤型加勁樑%剪力滯%變分法%疊加原理%有限元法
현색교%판항결합형가경량%전력체%변분법%첩가원리%유한원법
suspension bridge%plate and truss composite stiffening girder%shear lag%varia-tional calculus%principle of superposition%finite element method
针对采用板壳有限元方法计算悬索桥板桁结合型加劲梁桥面系剪力滞的建模工作量巨大、效率低下的情况,根据该类结构剪力滞的特性,研究其简化计算方法。该方法采用换算梁法将板桁结合桥面系桁梁换算为连续薄壁梁;建立能够考虑剪切变形影响的单主梁悬索桥有限元模型;以变分法为基础,将考虑了结构几何非线性影响的加载影响区间作为等效简支梁的跨度,将作用于该区间的活载、吊索力和支座反力作为荷载;根据叠加原理进行组合荷载作用下的剪力滞求解。以拟修建的某铁路悬索桥为例,采用ANSYS建立全桥板壳有限元模型与简化方法进行对比分析,结果表明简化方法具有较高的计算精度。
針對採用闆殼有限元方法計算懸索橋闆桁結閤型加勁樑橋麵繫剪力滯的建模工作量巨大、效率低下的情況,根據該類結構剪力滯的特性,研究其簡化計算方法。該方法採用換算樑法將闆桁結閤橋麵繫桁樑換算為連續薄壁樑;建立能夠攷慮剪切變形影響的單主樑懸索橋有限元模型;以變分法為基礎,將攷慮瞭結構幾何非線性影響的加載影響區間作為等效簡支樑的跨度,將作用于該區間的活載、弔索力和支座反力作為荷載;根據疊加原理進行組閤荷載作用下的剪力滯求解。以擬脩建的某鐵路懸索橋為例,採用ANSYS建立全橋闆殼有限元模型與簡化方法進行對比分析,結果錶明簡化方法具有較高的計算精度。
침대채용판각유한원방법계산현색교판항결합형가경량교면계전력체적건모공작량거대、효솔저하적정황,근거해류결구전력체적특성,연구기간화계산방법。해방법채용환산량법장판항결합교면계항량환산위련속박벽량;건립능구고필전절변형영향적단주량현색교유한원모형;이변분법위기출,장고필료결구궤하비선성영향적가재영향구간작위등효간지량적과도,장작용우해구간적활재、조색력화지좌반력작위하재;근거첩가원리진행조합하재작용하적전력체구해。이의수건적모철로현색교위례,채용ANSYS건립전교판각유한원모형여간화방법진행대비분석,결과표명간화방법구유교고적계산정도。
T he simplified calculation method for the shear lag of floor system of the plate and truss composite stiffening girder of suspension bridge was researched in the light of the shear lag characteristics of such type of the structure because the work load of modeling for calculating the shear lag ,using the plate and shell finite element method was enormous and the working efficiency was low .In the simplified method ,the truss in the floor system was converted into a continuous thin‐wall girder by the equivalent beam method and the finite element model of the single main girder suspension bridge that could consider the shear deformation influences w as set up .Based on the variational calculus ,the loading influential intervals that considered the structural geometric nonlinearity influences were taken as the span length of an equivalent simply‐supported girder ,the live load ,suspender forces and bearing reaction forces acting on the intervals were taken as the loads and the shear lag under the action of the combination load was solved on the principle of su‐perposition .By way of example of a railway suspension bridge to be built ,the ANSYS was used to set up the plate and shell finite element model for the w hole bridge of the bridge and the calculation of the shear lag of the model w as analyzed and compared to that implemented by the simplified method .The results of the analysis and comparison proved that the simplified method has high cal‐culation accuracy .