为探寻钻孔爆破孔间最佳延期时间,采用高速摄影技术、动态应变测试方法以及数码电子起爆系统等高精度试验设备,从新自由面形成时间和应力波残余量两方面因素考虑,通过混凝土边坡模型单孔爆破高速摄影拍摄和逐孔爆破动态应变测试试验进行分析研究。孔间延时时间为5 ms时,前后炮孔间应力波叠加情况很好,但是后孔起爆时未能形成良好的自由面;当孔间延时时间为10 ms时,既能保证有10 mm以上的裂缝形成,后孔起爆时又仍有较大残余应力存在于介质中,有利于形成良好的破碎效果;当孔间延时时间为15 ms时,介质中由前孔爆破产生的残余应力几乎消失;当孔间岩石在20 ms以上时,后孔起爆不受前孔爆破应力波影响。综合考虑,建议逐孔微差爆破中孔间最佳延时时间控制在10~15 ms。
為探尋鑽孔爆破孔間最佳延期時間,採用高速攝影技術、動態應變測試方法以及數碼電子起爆繫統等高精度試驗設備,從新自由麵形成時間和應力波殘餘量兩方麵因素攷慮,通過混凝土邊坡模型單孔爆破高速攝影拍攝和逐孔爆破動態應變測試試驗進行分析研究。孔間延時時間為5 ms時,前後砲孔間應力波疊加情況很好,但是後孔起爆時未能形成良好的自由麵;噹孔間延時時間為10 ms時,既能保證有10 mm以上的裂縫形成,後孔起爆時又仍有較大殘餘應力存在于介質中,有利于形成良好的破碎效果;噹孔間延時時間為15 ms時,介質中由前孔爆破產生的殘餘應力幾乎消失;噹孔間巖石在20 ms以上時,後孔起爆不受前孔爆破應力波影響。綜閤攷慮,建議逐孔微差爆破中孔間最佳延時時間控製在10~15 ms。
위탐심찬공폭파공간최가연기시간,채용고속섭영기술、동태응변측시방법이급수마전자기폭계통등고정도시험설비,종신자유면형성시간화응력파잔여량량방면인소고필,통과혼응토변파모형단공폭파고속섭영박섭화축공폭파동태응변측시시험진행분석연구。공간연시시간위5 ms시,전후포공간응력파첩가정황흔호,단시후공기폭시미능형성량호적자유면;당공간연시시간위10 ms시,기능보증유10 mm이상적렬봉형성,후공기폭시우잉유교대잔여응력존재우개질중,유리우형성량호적파쇄효과;당공간연시시간위15 ms시,개질중유전공폭파산생적잔여응력궤호소실;당공간암석재20 ms이상시,후공기폭불수전공폭파응력파영향。종합고필,건의축공미차폭파중공간최가연시시간공제재10~15 ms。
To explore the optimal delay time between the blast holes,high precision experiment device and technology are adopted,including high speed photography,dynamic strain test method,digital electronic ignition system and others. Consider-ing the factors from new free surface forming time and the residual mount of stress wave,investigation is made through concrete slope model of single hole blasting of high speed photography and hole by hole blasting dynamical strain test. The results show that:when the delay time between holes is 5 ms,the stress wave superposition between two holes is good,but the good free sur-face is not formed at the later hole;When the delay time between holes is 10 ms,the formation of cracks in 10 mm above is en-sured,and also the subsequent hole still have a larger residual stress existing in the medium. It is conducive to the formation of good crushing effect;When the delay time between hole is 15ms,the residual stress generated by the front hole almost disap-peared;When the delay time between holes is above 20 ms,blasting of the latter hole is not affected by the front hole. After comprehensive consideration,it is suggested that the optimal delay time between holes ranges from 10 to 15 ms in hole-by-hole millisecond blasting.