广西水利水电
廣西水利水電
엄서수이수전
GX WATER RESOURCES & HYDROPOWER ENGINEERING
2015年
3期
5-7,18
,共4页
长洲水利枢纽%南安水闸%稳定分析%加固%设计
長洲水利樞紐%南安水閘%穩定分析%加固%設計
장주수리추뉴%남안수갑%은정분석%가고%설계
Changzhou Hydraulic Complex%Nanan sluice%stability analysis%reinforcement%design
介绍了长洲水利枢纽库区南安防护片南安水闸的工程概况,分析了南安水闸由浆砌石改为钢筋混凝土闸的稳定情况,通过对闸室的稳定分析,并结合工程实际情况,提出了加固措施。
介紹瞭長洲水利樞紐庫區南安防護片南安水閘的工程概況,分析瞭南安水閘由漿砌石改為鋼觔混凝土閘的穩定情況,通過對閘室的穩定分析,併結閤工程實際情況,提齣瞭加固措施。
개소료장주수리추뉴고구남안방호편남안수갑적공정개황,분석료남안수갑유장체석개위강근혼응토갑적은정정황,통과대갑실적은정분석,병결합공정실제정황,제출료가고조시。
An introduction was made on the Nanan sluice in the Nanan Protective Zone of reservoir area of Chang?zhou Hydraulic Complex. Because the cement laid stone masonry gate room was planned to be reformed into rein?forced concrete structure, the authors made a stability analysis, and put forward reinforcement measures combined with actual situation .