堤防工程施工,多在汛前完成,施工任务紧迫、施工强度较高,采取必要和切实可行的保障措施才能使度汛工期目标得以实现。笔者以淮河流域荆山湖行洪区堤防工程为例,对施工中采取的各种行之有效的保障措施进行了总结和分析,供参考。
隄防工程施工,多在汛前完成,施工任務緊迫、施工彊度較高,採取必要和切實可行的保障措施纔能使度汛工期目標得以實現。筆者以淮河流域荊山湖行洪區隄防工程為例,對施工中採取的各種行之有效的保障措施進行瞭總結和分析,供參攷。
제방공정시공,다재신전완성,시공임무긴박、시공강도교고,채취필요화절실가행적보장조시재능사도신공기목표득이실현。필자이회하류역형산호행홍구제방공정위례,대시공중채취적각충행지유효적보장조시진행료총결화분석,공삼고。
Embankment projects are mostly completed before flood season, which are characterized by pressing construction tasks and higher construction strength. Targets in flood season can be realized by adopting necessary and feasible guarantee measures. The author adopts embankment project of Jingshanhu flood way district in Huaihe River basin as example for summarizing and analyzing various feasible guarantee measures adopted in construction as reference.