施工管理%节点%施工工序
施工管理%節點%施工工序
시공관리%절점%시공공서
construction management%node%construction process
论述了KJ826矿压监测系统的特点,结合惠阳煤业15号煤层赋存特征和采掘巷道布置特点,确定了15101工作面和15103工作面矿压布置方案。
論述瞭KJ826礦壓鑑測繫統的特點,結閤惠暘煤業15號煤層賦存特徵和採掘巷道佈置特點,確定瞭15101工作麵和15103工作麵礦壓佈置方案。
논술료KJ826광압감측계통적특점,결합혜양매업15호매층부존특정화채굴항도포치특점,학정료15101공작면화15103공작면광압포치방안。
This paper discussed the characteristics of KJ826 mine pressure monitoring, and determine the reasonable mine pressure construction sequence in 15101 and 15103 face combined with characteristics of occurrence and mining roadway layout 15# coal seam in Huiyang Coal Industry.