烟气脱硫%脱硫废水%改进措施
煙氣脫硫%脫硫廢水%改進措施
연기탈류%탈류폐수%개진조시
flue gas desulfurization%wastewater from desulfurization%Improvement measures
分析了当涂电厂2×600MW机组湿式石灰石(石灰)-石膏法烟气脱硫废水的形成以及各种污染物来源,介绍脱硫废水处理系统工艺流程。总结归纳脱硫废水处理系统在实际运行中出现的问题,并对现有工艺处理中出现的问题提出相应的改进措施。
分析瞭噹塗電廠2×600MW機組濕式石灰石(石灰)-石膏法煙氣脫硫廢水的形成以及各種汙染物來源,介紹脫硫廢水處理繫統工藝流程。總結歸納脫硫廢水處理繫統在實際運行中齣現的問題,併對現有工藝處理中齣現的問題提齣相應的改進措施。
분석료당도전엄2×600MW궤조습식석회석(석회)-석고법연기탈류폐수적형성이급각충오염물래원,개소탈류폐수처리계통공예류정。총결귀납탈류폐수처리계통재실제운행중출현적문제,병대현유공예처리중출현적문제제출상응적개진조시。
This paper introduces the formation of wastewater and source of various pollutants from the desulfurization gypsum quality control of wet limestone— gypsum FGD of 2×600 MW in dangtu power plant.The process of wastewater treatment system being presented ,and the problems existing in practical operation being summarized up and concluded. Some improvements and propositions have also been put forward.