青龙水电站%缆机%设计
青龍水電站%纜機%設計
청룡수전참%람궤%설계
Qinglong Hydropower Station%Cable Crane%Design
结合青龙水电站工程实际情况,对大坝施工时的设备、材料吊装的问题,设计了简易缆机,为工程的顺利进行提供有力保障,同时节约了费用。
結閤青龍水電站工程實際情況,對大壩施工時的設備、材料弔裝的問題,設計瞭簡易纜機,為工程的順利進行提供有力保障,同時節約瞭費用。
결합청룡수전참공정실제정황,대대패시공시적설비、재료조장적문제,설계료간역람궤,위공정적순리진행제공유력보장,동시절약료비용。
In this paper , according to the practical situation of the Qinglong hydropower station project , a simple cable crane has been designed , in order to solve the hoisting problems of equipments and materials during dam construction .By the application of the cable crane , not only the powerful guarantee for the project has been provided smoothly , but also the cost of the investment has been cut down .