引水式电站%尾水渠%特征水位%有坎宽顶堰
引水式電站%尾水渠%特徵水位%有坎寬頂堰
인수식전참%미수거%특정수위%유감관정언
water diversion tape hydropower station%tailrace%characteristics of water level%broad crested weir
水电站投产运行后,尾水位由于各方面原因变动,对水电站运行也将造成一定影响,以新疆塔吉克二级水电站为例,尾水渠末端设置有坎宽顶堰,由最低尾水位计算堰顶高程,并由设计的有坎宽顶堰及最大设计流量计算最高尾水位。从而使水电站尾水不因下游渠道冲刷而变化。
水電站投產運行後,尾水位由于各方麵原因變動,對水電站運行也將造成一定影響,以新疆塔吉剋二級水電站為例,尾水渠末耑設置有坎寬頂堰,由最低尾水位計算堰頂高程,併由設計的有坎寬頂堰及最大設計流量計算最高尾水位。從而使水電站尾水不因下遊渠道遲刷而變化。
수전참투산운행후,미수위유우각방면원인변동,대수전참운행야장조성일정영향,이신강탑길극이급수전참위례,미수거말단설치유감관정언,유최저미수위계산언정고정,병유설계적유감관정언급최대설계류량계산최고미수위。종이사수전참미수불인하유거도충쇄이변화。
after hydropower station put into operation, the tail water level changed due to various aspects reason, and caused an influence on hydropower station operation. Taking Xinjiang Tajik secondary hydropower station as an example, the end of the tailrace set broad crested weir, this paper calculates weir crest elevation by the lowest levels, and calculates the highest tail water level by the broad crested weir and maximum design flow, so that the hydropower station tail water will not change due to downstream channel scour.