非通航孔桥%箱梁%全断面一次浇筑%施工工艺
非通航孔橋%箱樑%全斷麵一次澆築%施工工藝
비통항공교%상량%전단면일차요축%시공공예
non navigable bridge%box girder%full-section once concreting%construction technology
港珠澳大桥工程东人工岛非通航孔桥为现浇预应力连续箱梁,共两联,先施工第二联,采用两次分层浇筑施工工艺,第二联施工完成后进行工艺总结改进,第一联则采用全断面一次浇筑成型,优化了模板及混凝土施工工艺,在成品质量、进度成本方面具有显著的成效。
港珠澳大橋工程東人工島非通航孔橋為現澆預應力連續箱樑,共兩聯,先施工第二聯,採用兩次分層澆築施工工藝,第二聯施工完成後進行工藝總結改進,第一聯則採用全斷麵一次澆築成型,優化瞭模闆及混凝土施工工藝,在成品質量、進度成本方麵具有顯著的成效。
항주오대교공정동인공도비통항공교위현요예응력련속상량,공량련,선시공제이련,채용량차분층요축시공공예,제이련시공완성후진행공예총결개진,제일련칙채용전단면일차요축성형,우화료모판급혼응토시공공예,재성품질량、진도성본방면구유현저적성효。
The non navigable bridge of the Hongkong-Zhuhai-Macao Bridge east island is a cast-in-situ prestressed concrete box girder, a total of two joints. The second joint was first constructed, adopted twice layered casting construction technology. The technology had been summarized and optimized after the second joint construction finished. Then the first joint adopted the full-section once concreting construction technology, which has optimized the construction technologies of formwork and concrete, and has made big progress in the finished product quality and schedule cost.