监测监控%切眼贯通%优化施工组织%措施的选择与配合
鑑測鑑控%切眼貫通%優化施工組織%措施的選擇與配閤
감측감공%절안관통%우화시공조직%조시적선택여배합
monitoring and controlling%Tunnel Through%Optimizing the construction organization%And with the choice of measures
矿井受地质条件、采场接续的需要不可避免的出现孤岛工作面,会进一步增加了采掘施工中的冲击危险性。通过防冲监测系统反馈信息,结合冲击危险因素分析,优化施工组织、深化冲击地压防治措施的选择与配合,实现深井厚煤层半孤岛面切眼的安全贯通。
礦井受地質條件、採場接續的需要不可避免的齣現孤島工作麵,會進一步增加瞭採掘施工中的遲擊危險性。通過防遲鑑測繫統反饋信息,結閤遲擊危險因素分析,優化施工組織、深化遲擊地壓防治措施的選擇與配閤,實現深井厚煤層半孤島麵切眼的安全貫通。
광정수지질조건、채장접속적수요불가피면적출현고도공작면,회진일보증가료채굴시공중적충격위험성。통과방충감측계통반궤신식,결합충격위험인소분석,우화시공조직、심화충격지압방치조시적선택여배합,실현심정후매층반고도면절안적안전관통。
Affected by geological conditions, mine stope continuation needs inevitably island working face, to further increase the impact of risk in construction. The anti scour monitoring system feedback information, analysis the impact of risk factors with the selection and optimization of construction organization, cooperation, deepen the rockburst prevention measures, through the implementation of security of thick coal seam semi isolated face cut eye.