高强度开采引起的地表裂缝严重破坏矿区生态环境,对矿井的安全生产造成很大隐患。为了掌握高强度开采地表裂缝形成机理,以神东矿区地质采矿条件为基础,通过现场监测和理论分析方法,得到了地表裂缝分布规律及变形参数,分析了矿山高强度开采产生的非连续变形发育分布特征与地质采矿条件之间关系。研究表明:在高强度开采条件下,动态拉伸型地表裂缝随工作面推进而周期性地超前出现,超前距为15m,超前角为83°,裂缝密度1m左右,宽度1~3cm。台阶型裂缝总是出现在开采工作面边界的上下方、停采线上方和开切眼附近,裂缝落差20~40cm,间距8~11m,滞后距为4.2m,滞后角为86°。同时指出上覆厚风积沙松散层特性使地表裂缝具有一定的自动修复功能。
高彊度開採引起的地錶裂縫嚴重破壞礦區生態環境,對礦井的安全生產造成很大隱患。為瞭掌握高彊度開採地錶裂縫形成機理,以神東礦區地質採礦條件為基礎,通過現場鑑測和理論分析方法,得到瞭地錶裂縫分佈規律及變形參數,分析瞭礦山高彊度開採產生的非連續變形髮育分佈特徵與地質採礦條件之間關繫。研究錶明:在高彊度開採條件下,動態拉伸型地錶裂縫隨工作麵推進而週期性地超前齣現,超前距為15m,超前角為83°,裂縫密度1m左右,寬度1~3cm。檯階型裂縫總是齣現在開採工作麵邊界的上下方、停採線上方和開切眼附近,裂縫落差20~40cm,間距8~11m,滯後距為4.2m,滯後角為86°。同時指齣上覆厚風積沙鬆散層特性使地錶裂縫具有一定的自動脩複功能。
고강도개채인기적지표렬봉엄중파배광구생태배경,대광정적안전생산조성흔대은환。위료장악고강도개채지표렬봉형성궤리,이신동광구지질채광조건위기출,통과현장감측화이론분석방법,득도료지표렬봉분포규률급변형삼수,분석료광산고강도개채산생적비련속변형발육분포특정여지질채광조건지간관계。연구표명:재고강도개채조건하,동태랍신형지표렬봉수공작면추진이주기성지초전출현,초전거위15m,초전각위83°,렬봉밀도1m좌우,관도1~3cm。태계형렬봉총시출현재개채공작면변계적상하방、정채선상방화개절안부근,렬봉락차20~40cm,간거8~11m,체후거위4.2m,체후각위86°。동시지출상복후풍적사송산층특성사지표렬봉구유일정적자동수복공능。
The surface fissures caused by high intensity mining destroy the ecological environment of mining district seriously , and they cause hidden hazard to work safety of mine .In order to grasp the formation mechanism of sur-face fissures caused by high intensity mining , based on the geological mining conditions in Shendong mining dis-trict, the distribution law and deformation parameters of surface fissures were obtained by field monitoring and theo -retical analysis , and the relationship between the development and distribution characteristic of discontinuous de -formation caused by high intensity mining and the geological mining conditions was analyzed .The results showed that:in the condition of high intensity mining , the dynamic stretch surface fissures always appear in advance peri-odically with the development of working face , the advance distance is 15m, the advance angle is 83°, the density of fissures is about 1m, and the width is 1~3cm.The step fissures always appears above and below the mining face boundary, above stopping mining line and nearby the open-off cut, the drop of fissure is 20~40cm, the separation distance is 8~11cm, the lag distance is 4.2m, and the lag angle is 86°.Meanwhile, it was pointed out that the characteristic of overlying thick aeolian sand unconsolidated formation make the surface fissures with a certain auto -mated repair function .