石油钻采工艺
石油鑽採工藝
석유찬채공예
OIL DRILLING & PRODUCTION TECHNOLOGY
2015年
4期
113-116
,共4页
吴运强%毕岩滨%纪萍%汪进%贾寒%周洪涛
吳運彊%畢巖濱%紀萍%汪進%賈寒%週洪濤
오운강%필암빈%기평%왕진%가한%주홍도
聚乙烯亚胺冻胶%成胶时间%高温高矿化度%阴离子聚丙烯酰胺%堵水剂
聚乙烯亞胺凍膠%成膠時間%高溫高礦化度%陰離子聚丙烯酰胺%堵水劑
취을희아알동효%성효시간%고온고광화도%음리자취병희선알%도수제
PEI gel%gelation time%high temperature and high salinity%anionic polyacrylamide%water shutoff agent
针对高温高矿化度地层堵水需求,研制了一种耐高温高矿化度的以阴离子聚丙烯酰胺为主剂的冻胶型堵剂,交联剂采用水溶性聚合物聚乙烯亚胺(PEI),并加入保护剂减缓高温下主剂的水解。实验考察了主剂质量分数、主剂分子量、PEI质量分数、PEI分子量、矿化度和pH值等因素对PEI冻胶成胶性能的影响。实验结果表明:随着主剂和PEI相对分子质量增加,主剂和PEI质量分数的增加,成胶时间缩短,但交联剂质量分数过高易发生过交联现象,造成冻胶过早脱水;成胶时间随着pH值的增加而缩短,随矿化度的增加而变长。在110℃条件下,对于NaCl含量为50000 mg/L的地层水,该冻胶强度高,耐温性好,封堵效果好且至少120 d不脱水。堵剂体系最佳配方为:0.6%~0.8%阴离子聚丙烯酰胺+0.3%~0.7%PEI+0.8%~1%高温保护剂。
針對高溫高礦化度地層堵水需求,研製瞭一種耐高溫高礦化度的以陰離子聚丙烯酰胺為主劑的凍膠型堵劑,交聯劑採用水溶性聚閤物聚乙烯亞胺(PEI),併加入保護劑減緩高溫下主劑的水解。實驗攷察瞭主劑質量分數、主劑分子量、PEI質量分數、PEI分子量、礦化度和pH值等因素對PEI凍膠成膠性能的影響。實驗結果錶明:隨著主劑和PEI相對分子質量增加,主劑和PEI質量分數的增加,成膠時間縮短,但交聯劑質量分數過高易髮生過交聯現象,造成凍膠過早脫水;成膠時間隨著pH值的增加而縮短,隨礦化度的增加而變長。在110℃條件下,對于NaCl含量為50000 mg/L的地層水,該凍膠彊度高,耐溫性好,封堵效果好且至少120 d不脫水。堵劑體繫最佳配方為:0.6%~0.8%陰離子聚丙烯酰胺+0.3%~0.7%PEI+0.8%~1%高溫保護劑。
침대고온고광화도지층도수수구,연제료일충내고온고광화도적이음리자취병희선알위주제적동효형도제,교련제채용수용성취합물취을희아알(PEI),병가입보호제감완고온하주제적수해。실험고찰료주제질량분수、주제분자량、PEI질량분수、PEI분자량、광화도화pH치등인소대PEI동효성효성능적영향。실험결과표명:수착주제화PEI상대분자질량증가,주제화PEI질량분수적증가,성효시간축단,단교련제질량분수과고역발생과교련현상,조성동효과조탈수;성효시간수착pH치적증가이축단,수광화도적증가이변장。재110℃조건하,대우NaCl함량위50000 mg/L적지층수,해동효강도고,내온성호,봉도효과호차지소120 d불탈수。도제체계최가배방위:0.6%~0.8%음리자취병희선알+0.3%~0.7%PEI+0.8%~1%고온보호제。
A gel type shutoff agent with anionic polyacrylamide as a main agent required for high temperature and high salinity formation water shutoff was developed using a crosslinking agent of water soluble polymer-polyethylenimine (PEI), and protective agent was added to slow down hydrolysis of the main agent under high temperature. The impact of main agent mass fraction, main agent molecular weight, PEI mass fraction, PEI molecular weight, salinity and pH was experimentally investigated on gelling performance of PEI gel. Experimental results show that the relative molecular weights of main agent and PEI increase as the mass fraction of main agent and PEI increases while the gelation time is shortened. But under high mass fraction, excessive crosslinking is more likely to occur, causing premature gel dehydration. The gelation time is shortened with the increase of pH values, and becomes longer with the increase of salinity. At 110℃, for formation water with NaCl content of 50 000 mg / L, the gel shows high strength and good resistance to temperature and good blocking effectiveness, and remains hydrated for at least 120 days. The optimum formula for water shutoff system is 0.6% to 0.8% anionic polyacrylamide & 0.3% to 0.7% PEI & 0.8% to 1% high temperature protective agent.