防波堤%扭王字块%安装
防波隄%扭王字塊%安裝
방파제%뉴왕자괴%안장
breakwater%accropode%installation
外海防波堤水下安装扭王字块质量控制难;施工过程中受风浪、涌浪影响大,作业时间短,进度控制难,特别是大规模扭王字块安装,质量和进度关系到防波堤在施工过程中的结构安全。本文以鸿山热电厂煤码头及引堤工程为实例,介绍和总结了大规模扭王字块安装所采取的技术与控制措施,对类似工程施工具有一定的借鉴。
外海防波隄水下安裝扭王字塊質量控製難;施工過程中受風浪、湧浪影響大,作業時間短,進度控製難,特彆是大規模扭王字塊安裝,質量和進度關繫到防波隄在施工過程中的結構安全。本文以鴻山熱電廠煤碼頭及引隄工程為實例,介紹和總結瞭大規模扭王字塊安裝所採取的技術與控製措施,對類似工程施工具有一定的藉鑒。
외해방파제수하안장뉴왕자괴질량공제난;시공과정중수풍랑、용랑영향대,작업시간단,진도공제난,특별시대규모뉴왕자괴안장,질량화진도관계도방파제재시공과정중적결구안전。본문이홍산열전엄매마두급인제공정위실례,개소화총결료대규모뉴왕자괴안장소채취적기술여공제조시,대유사공정시공구유일정적차감。
It is difficult to control the quality of installing accropodes underwater for open sea breakwater. Stormy wave and surge affect the construction to a high extent which limit the working time and cause the difficulty of schedule control. In particular, the installation quality and progress of mass accropodes are key factors for the structural safety of breakwater. Based on Hongshan thermal plant coal-receiving terminal and causeway project, the techniques and control measures taken for installing mass accropodes are introduced and summarized, which serves as a reference for the construction of similar projects.