以某500 kV 变电站20米高空挂拆接地线为例,介绍了一种用于高空挂拆接地线的自动机械手的设计原理,用机械手代替传统人工操作来挂拆接地线,降低风险和对人体的伤害。
以某500 kV 變電站20米高空掛拆接地線為例,介紹瞭一種用于高空掛拆接地線的自動機械手的設計原理,用機械手代替傳統人工操作來掛拆接地線,降低風險和對人體的傷害。
이모500 kV 변전참20미고공괘탁접지선위례,개소료일충용우고공괘탁접지선적자동궤계수적설계원리,용궤계수대체전통인공조작래괘탁접지선,강저풍험화대인체적상해。
Abstact: . This paper takes the Yunnan power grid 500 kV substation 20 meters altitude peacehanging and disassembling grounding line as an example to introduce a kind ofhanging and disassembling design principle of automatic mechanical hand ground wireis used for high altitude, handheld intelligent terminal operations byvisualization of vector map contol infinite robot, 3D satellite map, sup-port for multiple users to monitor, manipulator to replace the traditional manual operation to hang downground, reduce the risk and the harm to the human body.