西北水电
西北水電
서북수전
NORTHWEST WATER POWER
2015年
4期
27-30
,共4页
乌东德水电站%导流洞%施工测量%自由设站
烏東德水電站%導流洞%施工測量%自由設站
오동덕수전참%도류동%시공측량%자유설참
Wudongde Hydropower Project%underground diversion tunnel%construction survey%free station
利用乌东德水电站工程中对导流洞的开挖放样、采用岩壁上布设控制点,对各种自由设站的数学模型进行了探讨,介绍了自由设站在乌东德水电站导流洞施工测量中的具体实施方法及应用,并提出了自由设站法的测量优势,测量精度满足规范要求。
利用烏東德水電站工程中對導流洞的開挖放樣、採用巖壁上佈設控製點,對各種自由設站的數學模型進行瞭探討,介紹瞭自由設站在烏東德水電站導流洞施工測量中的具體實施方法及應用,併提齣瞭自由設站法的測量優勢,測量精度滿足規範要求。
이용오동덕수전참공정중대도류동적개알방양、채용암벽상포설공제점,대각충자유설참적수학모형진행료탐토,개소료자유설참재오동덕수전참도류동시공측량중적구체실시방법급응용,병제출료자유설참법적측량우세,측량정도만족규범요구。
By application of the excavation setting of the diversion tunnel and the control points arranged on the rock wall of Wudongde Hydropower Project, the specific implementation methods and application of free station in the construction surveying of the diversion tun-nel of Wudongde Hydropower Project are introduced.Furthermore, the surveying advantages of the free station are proposed.The survey-ing precision satisfies the requirements of specification as well.