中国科技论文
中國科技論文
중국과기논문
Sciencepaper Online
2015年
15期
1809-1812,1821
,共5页
滕超%刘佳%邱梅%施龙青%孙波%孙庆云
滕超%劉佳%邱梅%施龍青%孫波%孫慶雲
등초%류가%구매%시룡청%손파%손경운
矿井构造%趋势面分析%趋势值%剩余值%鄂庄井田
礦井構造%趨勢麵分析%趨勢值%剩餘值%鄂莊井田
광정구조%추세면분석%추세치%잉여치%악장정전
mining structure%trend surface analysis%trend value%residual value%Ezhuang minefield
针对鄂庄井田断裂构造严重影响开采、开拓及采煤巷道布置的现状,选取7煤层底板标高为地质变量,运用趋势面分析方法,利用最小二乘法拟合,建立了4个二维多项式趋势面数学模型。通过拟合度检验、显著性检验和适度逐次检验,选取1~3次模型进行构造趋势面分析,避免盲目提高次数而使拟合方程产生不利影响。趋势分析结果与勘探成果相互验证,研究表明:鄂庄井田总体为一向斜构造,轴向 NE;该向斜自井田中东部发生分叉,形成东、西两向斜,东部向斜是由2个次级向斜和1个背斜相间排列构成的复向斜构造;落差大于30 m 的断层在剩余图上均有较好的反映,预测了部分勘探并未查明的构造异常区域。
針對鄂莊井田斷裂構造嚴重影響開採、開拓及採煤巷道佈置的現狀,選取7煤層底闆標高為地質變量,運用趨勢麵分析方法,利用最小二乘法擬閤,建立瞭4箇二維多項式趨勢麵數學模型。通過擬閤度檢驗、顯著性檢驗和適度逐次檢驗,選取1~3次模型進行構造趨勢麵分析,避免盲目提高次數而使擬閤方程產生不利影響。趨勢分析結果與勘探成果相互驗證,研究錶明:鄂莊井田總體為一嚮斜構造,軸嚮 NE;該嚮斜自井田中東部髮生分扠,形成東、西兩嚮斜,東部嚮斜是由2箇次級嚮斜和1箇揹斜相間排列構成的複嚮斜構造;落差大于30 m 的斷層在剩餘圖上均有較好的反映,預測瞭部分勘探併未查明的構造異常區域。
침대악장정전단렬구조엄중영향개채、개탁급채매항도포치적현상,선취7매층저판표고위지질변량,운용추세면분석방법,이용최소이승법의합,건립료4개이유다항식추세면수학모형。통과의합도검험、현저성검험화괄도축차검험,선취1~3차모형진행구조추세면분석,피면맹목제고차수이사의합방정산생불리영향。추세분석결과여감탐성과상호험증,연구표명:악장정전총체위일향사구조,축향 NE;해향사자정전중동부발생분차,형성동、서량향사,동부향사시유2개차급향사화1개배사상간배렬구성적복향사구조;락차대우30 m 적단층재잉여도상균유교호적반영,예측료부분감탐병미사명적구조이상구역。
The fracture structures of Ezhuang minefield have a strong impact on mining,exploiting and the arrangement of mining tunnel.In view of the current situation,the floor elevation of the 7 coalseam as the geological variable is selected to analyze the geological structure by means of the trend surface analysis.Four two-dimensional polynomial trend surface mathematical models are established based on the least square method.By investigating goodness-of-fit test,significance test and stepwise sequential test,1-3 trend surface models are provided to analyze the geological structure,so as to avoid increasing adverse impact on fitting equation with increasing the fitting number.The results of trend surface analysis are approximately consistent with the geological work,indicating that,Ezhuang minefield belongs to a syncline structure with the axes running NE.The syncline structure is di-vided into two parts from east-central minefield.The east syncline is a syclinoriun structure,which consists of two secondary synclines and one anticline.The fault throw greater than 30 m is well indicated in residual map,which reveals that the geological structure abnormal areas can be predicted.