电力系统自动化
電力繫統自動化
전력계통자동화
AUTOMATION OF ELECTRIC POWER SYSTEMS
2015年
17期
49-55
,共7页
需求响应%分时电价%聚类负荷%二分法%可靠性评估
需求響應%分時電價%聚類負荷%二分法%可靠性評估
수구향응%분시전개%취류부하%이분법%가고성평고
demand response%time of use pricing%clustered load%dichotomy%reliability evaluation
鉴于峰谷分时电价能够引导用户用电行为,促使用户积极参与到电力系统的削峰填谷行为中,而负荷与可靠性之间存在着复杂的非线性关系,文中重点研究了需求侧响应对配电网供电可靠性的影响。首先,建立分时电价优化模型:进行时段划分、确定电力价格弹性矩阵和制定各时段电价,再以峰负荷最小及峰谷负荷差最小确定多目标优化函数,考虑电网和电力市场基本约束条件建立分时电价优化模型;然后,在基于二分法的聚类负荷分析法中引入依据电力报价的负荷修正环节;最后,将不同负荷水平下的可靠性指标按持续时间进行加权平均,得到精确的可靠性指标。利用上述模型和方法,对改进的 RBTS BUS6测试系统进行分时电价建模和可靠性评估。结果表明,需求响应策略改善了配电网的供电可靠性。
鑒于峰穀分時電價能夠引導用戶用電行為,促使用戶積極參與到電力繫統的削峰填穀行為中,而負荷與可靠性之間存在著複雜的非線性關繫,文中重點研究瞭需求側響應對配電網供電可靠性的影響。首先,建立分時電價優化模型:進行時段劃分、確定電力價格彈性矩陣和製定各時段電價,再以峰負荷最小及峰穀負荷差最小確定多目標優化函數,攷慮電網和電力市場基本約束條件建立分時電價優化模型;然後,在基于二分法的聚類負荷分析法中引入依據電力報價的負荷脩正環節;最後,將不同負荷水平下的可靠性指標按持續時間進行加權平均,得到精確的可靠性指標。利用上述模型和方法,對改進的 RBTS BUS6測試繫統進行分時電價建模和可靠性評估。結果錶明,需求響應策略改善瞭配電網的供電可靠性。
감우봉곡분시전개능구인도용호용전행위,촉사용호적겁삼여도전력계통적삭봉전곡행위중,이부하여가고성지간존재착복잡적비선성관계,문중중점연구료수구측향응대배전망공전가고성적영향。수선,건립분시전개우화모형:진행시단화분、학정전력개격탄성구진화제정각시단전개,재이봉부하최소급봉곡부하차최소학정다목표우화함수,고필전망화전력시장기본약속조건건립분시전개우화모형;연후,재기우이분법적취류부하분석법중인입의거전력보개적부하수정배절;최후,장불동부하수평하적가고성지표안지속시간진행가권평균,득도정학적가고성지표。이용상술모형화방법,대개진적 RBTS BUS6측시계통진행분시전개건모화가고성평고。결과표명,수구향응책략개선료배전망적공전가고성。
The implementation of time-of-use(TOU)pricing can guide power consumers”electricity using behavior to shift the load range.However,there is a complicated non-linear relationship between load and reliability.The paper focuses on the impact of demand response on distribution system reliability.An integrated model is proposed to describe TOU pricing,which consists of three steps:the division of TOU periods,the access to the electricity price in the optimization,and the constraint conditions considering operation and power market constraints while the objective function is determined by minimum peak load and minimum load range.Then,on the basis of the conventional evaluation method,an improved clustered load model based on dichotomy is proposed to handle the real-time load.Finally,accurate reliability indices are obtained by weighting average indices under different load levels.The validity of the above model and method is studied through numerical tests on modified RBTS BUS6 test system.The results show that TOU pricing has a positive impact on the distribution system reliability.